What’s included in this package?

  • 26.09.2019
  • Design

What’s included in this package?

What is included in the Premium package? Premium is more popular package under which you'll get entirely a professional logo that meets all of. Or, a Romance package might include champagne, chocolates, Rather than having to inform your outlets of what guests are staying on which packages. Package metadata include package description, package version, and dependencies (other packages that need to be installed beforehand).

What’s included in this package? - variant interesting

ALL INCLUDED PACKAGE: Ends 1/22/22. Available only in the U.S. (excludes Puerto Rico and U.S.V.I.). 1st & 2nd year Pricing: $64.99/mo for ENTERTAINMENT All Included; $69.99/mo for CHOICE All Included; $84.99/mo for ULTIMATE All Included; $134.99/mo for PREMIER All Included for first 12 mos. only.  After 12 mos. or loss of eligibility, then prevailing rate applies (currently $102/mo for ENTERTAINMENT All Included; $122/mo for CHOICE All Included; $151/mo for ULTIMATE All Included; $206/mo for PREMIER All Included), unless cancelled or changed prior to end of the promo period. Pricing subject to change. $5/mo. discount: Must enroll in autopay & paperless bill within 30 days of TV activation to receive bill credit starting in 1-3 bill cycles.  First time credit will include all credits earned since meeting offer requirements.  Must maintain autopay/paperless bill and valid email address to continue credits.  No credits in 2nd year for autopay/paperless bill.  Includes: All Included TV Pkg, monthly service & equipment fees for one Genie HD DVR, and standard pro installation. Additional Fees & Taxes: Price excludes Regional Sports Fee of up to $9.99/mo. (which is extra & applies to CHOICE and/or MÁS ULTRA and higher Pkgs.), applicable use tax expense surcharge on retail value of installation, custom installation, equipment upgrades/add-ons (min. $99 one-time & $7/mo. monthly fees for each extra receiver/DIRECTV Ready TV/Device), and certain other add’l fees & charges. See att.com/directvfees for additional details. Different offers may apply for eligible multi-dwelling unit and telco customers.

Источник: [https://torrent-igruha.org/3551-portal.html]

Tidyverse packages

Installation and use

  • Install all the packages in the tidyverse by running .

  • Run to load the core tidyverse and make it available in your current R session.

Learn more about the tidyverse package at https://tidyverse.tidyverse.org.

Core tidyverse

The core tidyverse includes the packages that you’re likely to use in everyday data analyses. As of tidyverse 1.3.0, the following packages are included in the core tidyverse:

ggplot2

ggplot2 is a system for declaratively creating graphics, based on The Grammar of Graphics. You provide the data, tell ggplot2 how to map variables to aesthetics, what graphical primitives to use, and it takes care of the details. Go to docs...

dplyr

dplyr provides a grammar of data manipulation, providing a consistent set of verbs that solve the most common data manipulation challenges. Go to docs...

tidyr

tidyr provides a set of functions that help you get to tidy data. Tidy data is data with a consistent form: in brief, every variable goes in a column, and every column is a variable. Go to docs...

readr

readr provides a fast and friendly way to read rectangular data (like csv, tsv, and fwf). It is designed to flexibly parse many types of data found in the wild, while still cleanly failing when data unexpectedly changes.  Go to docs...

purrr

purrr enhances R’s functional programming (FP) toolkit by providing a complete and consistent set of tools for working with functions and vectors. Once you master the basic concepts, purrr allows you to replace many for loops with code that is easier to write and more expressive. Go to docs...

tibble

tibble is a modern re-imagining of the data frame, keeping what time has proven to be effective, and throwing out what it has not. Tibbles are data.frames that are lazy and surly: they do less and complain more forcing you to confront problems earlier, typically leading to cleaner, more expressive code. Go to docs...

stringr

stringr provides a cohesive set of functions designed to make working with strings as easy as possible. It is built on top of stringi, which uses the ICU C library to provide fast, correct implementations of common string manipulations. Go to docs...

forcats

forcats provides a suite of useful tools that solve common problems with factors. R uses factors to handle categorical variables, variables that have a fixed and known set of possible values. Go to docs...

The tidyverse also includes many other packages with more specialised usage. They are not loaded automatically with , so you’ll need to load each one with its own call to .

Import

As well as readr, for reading flat files, the tidyverse package installs a number of other packages for reading data:

Wrangle

In addition to tidyr, and dplyr, there are five packages (including stringr and forcats) which are designed to work with specific types of data:

  • lubridate for dates and date-times.
  • hms for time-of-day values.
  • blob for storing blob (binary) data.

dplyr backends

There are also two packages that allow you to interface with different backends using the same dplyr syntax:

  • dbplyr allows you to use remote database tables by converting converting dplyr code into SQL.
  • dtplyr provides a data.table backend by automatically translating to the equivalent, but usually much faster, data.table code.

Program

In addition to purrr, which provides very consistent and natural methods for iterating on R objects, there are two additional tidyverse packages that help with general programming challenges:

  • magrittr provides the pipe, used throughout the tidyverse. It also provide a number of more specialised piping operators (like and ) that can be useful in other places.

  • glue provides an alternative to that makes it easier to combine data and strings.

Model

Modeling with the tidyverse uses the collection of tidymodels packages, which largely replace the modelr package used in R4DS. These packages provide a comprehensive foundation for creating and using models of all types. Visit the Getting Started guide or, for more detailed examples, go straight to the Learn page.

Get help

If you’re asking for R help, reporting a bug, or requesting a new feature, you’re more likely to succeed if you include a good reproducible example, which is precisely what the reprex package is meant for. You can learn more about reprex, along with other tips on how to help others help you in the help section.

Источник: [https://torrent-igruha.org/3551-portal.html]

Package manager

Software tools for handling software packages

Synaptic, example of a full-featured package manager

A package manager or package-management system is a collection of software tools that automates the process of installing, upgrading, configuring, and removing computer programs for a computer in a consistent manner.[1]

Early package managers, like from 1994, had no automatic dependency resolution[2] but could already drastically simplify the process of adding and removing software from a running system.[3] By around 1995, beginning with CPAN, package managers began doing the work of downloading packages from a repository, automatically resolving its dependencies and installing them as needed, making it much easier to install, uninstall and update software from a system.[4]

A package manager deals with packages, distributions of software and data in archive files. Packages contain metadata, such as the software's name, description of its purpose, version number, vendor, checksum (preferably a cryptographic hash function), and a list of dependencies necessary for the software to run properly. Upon installation, metadata is stored in a local package database. Package managers typically maintain a database of software dependencies and version information to prevent software mismatches and missing prerequisites. They work closely with software repositories, binary repository managers, and app stores.

Package managers are designed to eliminate the need for manual installs and updates. This can be particularly useful for large enterprises whose operating systems are typically consisting of hundreds or even tens of thousands of distinct software packages.[5]

Functions[edit]

Illustration of a package manager being used to downloadnew software. Manual actions can include accepting a license agreement or selecting some package-specific configuration options.

A software package is an archive file containing a computer program as well as necessary metadata for its deployment. The computer program can be in source code that has to be compiled and built first.[6] Package metadata include package description, package version, and dependencies (other packages that need to be installed beforehand).

Package managers are charged with the task of finding, installing, maintaining or uninstalling software packages upon the user's command. Typical functions of a package management system include:

  • Working with file archivers to extract package archives
  • Ensuring the integrity and authenticity of the package by verifying their checksums and digital certificates, respectively
  • Looking up, downloading, installing, or updating existing software from a software repository or app store
  • Grouping packages by function to reduce user confusion
  • Managing dependencies to ensure a package is installed with all packages it requires, thus avoiding "dependency hell"

Challenges with shared libraries[edit]

Computer systems that rely on dynamic library linking, instead of static library linking, share executable libraries of machine instructions across packages and applications. In these systems, complex relationships between different packages requiring different versions of libraries results in a challenge colloquially known as "dependency hell". On Microsoft Windows systems, this is also called "DLL hell" when working with dynamically linked libraries. Good package management is vital on these systems.[7] The Framework system from OPENSTEP was an attempt at solving this issue, by allowing multiple versions of libraries to be installed simultaneously, and for software packages to specify which version they were linked against.

Front-ends for locally compiled packages[edit]

System administrators may install and maintain software using tools other than package management software. For example, a local administrator may download unpackaged source code, compile it, and install it. This may cause the state of the local system to fall out of synchronization with the state of the package manager's database. The local administrator will be required to take additional measures, such as manually managing some dependencies or integrating the changes into the package manager.

There are tools available to ensure that locally compiled packages are integrated with the package management. For distributions based on .deb and .rpm files as well as Slackware Linux, there is CheckInstall, and for recipe-based systems such as Gentoo Linux and hybrid systems such as Arch Linux, it is possible to write a recipe first, which then ensures that the package fits into the local package database.[citation needed]

Maintenance of configuration[edit]

Particularly troublesome with software upgrades are upgrades of configuration files. Since package managers, at least on Unix systems, originated as extensions of file archiving utilities, they can usually only either overwrite or retain configuration files, rather than applying rules to them. There are exceptions to this that usually apply to kernel configuration (which, if broken, will render the computer unusable after a restart). Problems can be caused if the format of configuration files changes; for instance, if the old configuration file does not explicitly disable new options that should be disabled. Some package managers, such as Debian's dpkg, allow configuration during installation. In other situations, it is desirable to install packages with the default configuration and then overwrite this configuration, for instance, in headless installations to a large number of computers. This kind of pre-configured installation is also supported by dpkg.

Repositories[edit]

To give users more control over the kinds of software that they are allowing to be installed on their system (and sometimes due to legal or convenience reasons on the distributors' side), software is often downloaded from a number of software repositories.[8]

Upgrade suppression[edit]

When a user interacts with the package management software to bring about an upgrade, it is customary to present the user with the list of actions to be executed (usually the list of packages to be upgraded, and possibly giving the old and new version numbers), and allow the user to either accept the upgrade in bulk, or select individual packages for upgrades. Many package managers can be configured to never upgrade certain packages, or to upgrade them only when critical vulnerabilities or instabilities are found in the previous version, as defined by the packager of the software. This process is sometimes called version pinning.

For instance:

  • yum supports this with the syntax exclude=openoffice*[9]
  • pacman with IgnorePkg= openoffice[10] (to suppress upgrading openoffice in both cases)
  • dpkg and dselect support this partially through the hold flag in package selections
  • APT extends the hold flag through the complex "pinning" mechanism[11] (Users can also blacklist a package[12])
  • aptitude has "hold" and "forbid" flags
  • portage supports this through the package.mask configuration file

Cascading package removal[edit]

Some of the more advanced package management features offer "cascading package removal",[10] in which all packages that depend on the target package and all packages that only the target package depends on, are also removed.

Comparison of commands[edit]

Although the commands are specific for every particular package manager, they are to a large extent translatable, as most package managers offer similar functions.

Actionzypper[13]pacmanaptdnf (yum)portageNixHomebrew
install packagenix-env -i PACKAGE
remove package or
nix-env -e PACKAGE
remove package+orphans or
nix-env -e PACKAGE && nix-env -u
update software databasenix-channel --upgrade
show updatable packages or
nix-channel --upgrade && nix-env -u && nix-collect-garbage
delete orphans+confignix-collect-garbage -d
show orphans or
update allnix-env -u && nix-collect-garbage

The Arch Linux Pacman/Rosetta wiki offers an extensive overview.[14]

Prevalence[edit]

Package managers like dpkg have existed as early as 1994.[15]

Linux distributions oriented to binary packages rely heavily on package management systems as their primary means of managing and maintaining software. Mobile operating systems such as Android (Linux-based), iOS (Unix-based), and Windows Phone rely almost exclusively on their respective vendors' app stores and thus use their own dedicated package management systems.

Comparison with installers[edit]

A package manager is often called an "install manager", which can lead to a confusion between package managers and installers. The differences include:

Criterion Package manager Installer
Shipped with Usually, the operating system Each computer program
Location of installation information One central installation database It is entirely at the discretion of the installer. It could be a file within the app's folder, or among the operating system's files and folders. At best, they may register themselves with an uninstallers list without exposing installation information.
Scope of maintenance Potentially all packages on the system Only the product with which it was bundled
Developed by One package manager vendor Multiple installer vendors
Package format A handful of well-known formatsThere could be as many formats as the number of apps
Package format compatibility Can be consumed as long as the package manager supports it. Either newer versions of the package manager keep supporting it or the user does not upgrade the package manager. The installer is always compatible with its archive format, if it uses any. However, installers, like all computer programs, may be affected by software rot.

Comparison with build automation utility[edit]

Most software configuration management systems treat building software and deploying software as separate, independent steps. A build automation utility typically takes human-readable source code files already on a computer, and automates the process of converting them into a binary executable package on the same or remote computer. Later a package manager typically running on some other computer downloads those pre-built binary executable packages over the internet and installs them.

However, both kinds of tools have many commonalities:

  • For example, the dependency graphtopological sorting used in a package manager to handle dependencies between binary components is also used in a build manager to handle the dependency between source components.
  • For example, many makefiles support not only building executables, but also installing them with .
  • For example, every package manager for a source-based distribution – Portage, Sorcery, Homebrew, etc. – supports converting human-readable source code to binary executables and installing it.

A few tools, such as Maak and A-A-P, are designed to handle both building and deployment, and can be used as either a build automation utility or as a package manager or both.[16]

Common package managers and formats[edit]

Universal package manager[edit]

Also known as binary repository manager, it is a software tool designed to optimize the download and storage of binary files, artifacts and packages used and produced in the software development process.[17] These package managers aim to standardize the way enterprises treat all package types. They give users the ability to apply security and compliance metrics across all artifact types. Universal package managers have been referred to as being at the center of a DevOps toolchain.[18]

Package formats[edit]

Main articles: Package format and File archive

Each package manager relies on the format and metadata of the packages it can manage. That is, package managers need groups of files to be bundled for the specific package manager along with appropriate metadata, such as dependencies. Often, a core set of utilities manages the basic installation from these packages and multiple package managers use these utilities to provide additional functionality.

For example, yum relies on rpm as a backend. Yum extends the functionality of the backend by adding features such as simple configuration for maintaining a network of systems. As another example, the Synaptic Package Manager provides a graphical user interface by using the Advanced Packaging Tool (apt) library, which, in turn, relies on dpkg for core functionality.

Alien is a program that converts between different Linux package formats, supporting conversion between Linux Standard Base (LSB) compliant .rpm packages, .deb, Stampede (.slp), Solaris (.pkg) and Slackware (.tgz, .txz, .tbz, .tlz) packages.

In mobile operating systems, Google Play consumes Android application package (APK) package format while Microsoft Store uses APPX and XAP formats. (Both Google Play and Microsoft Store have eponymous package managers.)

Free and open source software systems[edit]

By the nature of free and open source software, packages under similar and compatible licenses are available for use on a number of operating systems. These packages can be combined and distributed using configurable and internally complex packaging systems to handle many permutations of software and manage version-specific dependencies and conflicts. Some packaging systems of free and open source software are also themselves released as free and open source software. One typical difference between package management in proprietary operating systems, such as Mac OS X and Windows, and those in free and open source software, such as Linux, is that free and open source software systems permit third-party packages to also be installed and upgraded through the same mechanism, whereas the package managers of Mac OS X and Windows will only upgrade software provided by Apple and Microsoft, respectively (with the exception of some third party drivers in Windows). The ability to continuously upgrade third party software is typically added by adding the URL of the corresponding repository to the package management's configuration file.

Application-level package managers[edit]

See also: List of software package management systems § Application-level package managers

Beside the system-level application managers, there are some add-on package managers for operating systems with limited capabilities and for programming languages in which developers need the latest libraries.

In contrast to system-level package managers, application-level package managers focus on a small part of the software system. They typically reside within a directory tree that is not maintained by the system-level package manager, such as c:\cygwin or /opt/sw.[19] However, this might not be the case for the package managers that deal with programming libraries, leading to a possible conflict as both package managers may claim to "own" a file and might break upgrades.

Impact[edit]

Ian Murdock had commented that package management is "the single biggest advancement Linux has brought to the industry", that it blurs the boundaries between operating system and applications, and that it makes it "easier to push new innovations [...] into the marketplace and [...] evolve the OS".[20]

There is also a conference for package manager developers known as PackagingCon. It was established in 2021 with the aim to understand different approaches to package management.[21]

See also[edit]

References[edit]

External links[edit]

Источник: [https://torrent-igruha.org/3551-portal.html]

What’s a Package?

If you’re new to packaging, you can think about a package as a container that you fill with metadata. It contains a set of related features, customizations, and schema. You use packages to move metadata from one Salesforce org to another.

Each second-generation managed package follows a distinct life cycle. You add metadata to a package, and create a new package version. While the package is continually evolving, each package version is an immutable artifact.

A package version contains the specific metadata and features associated with the package version, at the time it was created. As you iterate on your package, and add, remove, or change the packaged metadata, you create many package versions.

You can install a package version in a scratch, sandbox, trial, developer edition, or production org. Installing a package version is similar to deploying metadata. Each package version has a version number, and subscribers can install a new package version into their org through a package upgrade.

You can repeat the package development cycle any number of times. You can change metadata, create a package version, test the package version, and distribute it to your customers via AppExchange. This distinct app development life cycle lets you control exactly what, when, and how your metadata rolls out. In the installed org, you can inspect which metadata came from which package and the set of all metadata associated with a specific package.

Источник: [https://torrent-igruha.org/3551-portal.html]

Online Prices - What's Included?

Price shown online, are per person, unless specified and include:

• Air travel to and from the resorts as detailed.
• Coach transfer to and from the resorts as detailed, excluding Bulgarian Lakes and Mountains, summer & winter short breaks & winter ski package holidays operated by low cost airlines and in Croatia some cruises, Istria & Plitvice area holidays. (Coach transfers require a minimum number of passengers to operate, there may be a supplement if the minimum number is not reached).
• A luggage allowance per person. Hold luggage is up to 23kg, depending on airline) and hand luggage of 1 piece, weighing up to 10kg (depending on airline).
• All known current airport and security charges.
• The services of the Balkan Holidays representative or agent at the holiday centre's (excluding clients booked for accommodation only or hotels presented on the website.

The below items are optional and therefore are not included in our holiday packages:

• In-flight meals.
• Travel insurance.
• Seats together.

Applicable discounts and reductions, such as Early Booking Discounts and 3rd and 4th Adult reductions will be automatically deducted from your holiday cost.

 

 

Why book with us?

Balkan Holidays has 55 years of experience in providing great value summer and winter holidays
and since 1966 we have sold over 3 million holidays.

Источник: [https://torrent-igruha.org/3551-portal.html]

Here's what's in the bipartisan infrastructure package

It will deliver $550 billion of new federal investments in America's infrastructure over five years, touching everything from bridges and roads to the nation's broadband, water and energy systems. Experts say the money is sorely needed to ensure safe travel, as well as the efficient transport of goods and produce across the country. The nation's infrastructure system earned a C- score from the American Society of Civil Engineers earlier this year.
Democrats claim the legislation pays for itself through a multitude of measures and without raising taxes. But the Congressional Budget Office brushed aside several of those pay-for provisions, ultimately finding the package would add $256 billion to the deficit over the next 10 years. It's significantly smaller than the $2.25 trillion proposal that Biden unveiled in March, known as the American Jobs Plan.
Here's what's in the infrastructure package:
Funding for roads and bridges
The legislation calls for investing $110 billion for roads, bridges and major infrastructure projects. That's significantly less than the $159 billion that Biden initially requested in the American Jobs Plan.
Included is $40 billion for bridge repair, replacement and rehabilitation, according to the text. The White House says it would be the single, largest dedicated bridge investment since the construction of the interstate highway system, which started in the 1950s.
The deal also contains $16 billion for major projects that would be too large or complex for traditional funding programs, according to the White House.
Some 20%, or 173,000 miles, of the nation's highways and major roads are in poor condition, as are 45,000 bridges, according to the White House.
The investments will focus on climate change mitigation, resilience, equity and safety for all users, including cyclists and pedestrians.
Also in the package is $11 billion for transportation safety, including a program to help states and localities reduce crashes and fatalities, especially of cyclists and pedestrians, according to the White House. It willdirect funding for safety efforts involving highways, trucks, and pipeline and hazardous materials.
And it contains $1 billion to reconnect communities -- mainly disproportionately Black neighborhoods -- that were divided by highways and other infrastructure, according to the White House. It will fund planning, design, demolition and reconstruction of street grids, parks or other infrastructure.
Money for transit and rail
The package provides $39 billion to modernize public transit, according to the text. That's less than the $85 billion that Biden initially wanted to invest in modernizing transit systems and help them expand to meet rider demand.
The funds will repair and upgrade existing infrastructure, make stations accessible to all users, bring transit service to new communities and modernize rail and bus fleets, including replacing thousands of vehicles with zero-emission models, according to the White House.
The deal willalso invest $66 billion in passenger and freight rail, according to the text. The funds would eliminate Amtrak's maintenance backlog, modernize the Northeast Corridor line and bring rail service to areas outside the Northeast and mid-Atlantic regions, according to the White House. Included in the package is $12 billion in partnership grants for intercity rail service, including high-speed rail.
The funding is less than the $80 billion Biden originally wanted to send to Amtrak, which he relied upon for decades to get home to Delaware from Washington, DC.
Still, it would be the largest federal investment in public transit in history and in passenger rail since the creation of Amtrak 50 years ago, according to the White House.
The legislation provides a $65 billion investment in improving the nation's broadband infrastructure, according to the text. Biden initially wanted to invest $100 billion in broadband.
It also aims to help lower the price households pay for internet service by requiring federal funding recipients to offer a low-cost affordable plan, by creating price transparency and by boosting competition in areas where existing providers aren't providing adequate service. It willalso create a permanent federal program to help more low-income households access the internet, according to the White House fact sheet.
Upgrading airports, ports and waterways
The deal willinvest $17 billion in port infrastructure and $25 billion in airports to address repair and maintenance backlogs, reduce congestion and emissions near ports and airports and promote electrification and other low-carbon technologies, according to the White House.
It is similar to the funding in Biden's original proposal.
The legislation will provide $7.5 billion for zero- and low-emission buses and ferries, aiming to deliver thousands of electric school buses to districts across the country, according to the White House.
Another $7.5 billion will go to building a nationwide network of plug-in electric vehicle chargers, according to the text.
Improving power and water systems
The package invests $65 billion to rebuild the electric grid, according to the White House. It calls for building thousands of miles of new power lines and expanding renewable energy, the White House said.
It provides $55 billion to upgrade water infrastructure, according to the text. It will replace lead service lines and pipes so that communities have access to clean drinking water, the White House said.
Another $50 billion will go toward making the system more resilient -- protecting it from drought, floods and cyberattacks, the White House said.
Environmental remediation
The package provides $21 billion to clean up Superfund and brownfield sites, reclaim abandoned mine land and cap orphaned gas wells, according to the White House.

How Congress will pay for it

The legislation includes a multitude of measures to pay for the proposal -- none of which would raise taxes.
But while lawmakers claim the package pays for itself, the CBO score found it would instead add billions of dollars to the deficit over 10 years and that many of the pay-for provisions would not raise as much money as Democrats said they would.
The bottom line is that the legislation would directly add roughly $350 billion to the deficit, when taking into account $90 billion of spending in new contract authority, said Marc Goldwein, senior vice president at the Committee for a Responsible Federal Budget, a nonpartisan group that tracks federal spending.
According to the text and a 57-page summary of the legislation, lawmakers leaned heavily on repurposing unused Covid-19 relief funds to pay for the legislation. The CBO found these measures would provide roughly $22 billion in savings, rather than the roughly $263 billion claimed by lawmakers, Goldwein said.
The text lists savings from rescinding unobligated appropriations for the Economic Injury Disaster Loan program for small businesses and nonprofit groups, the Paycheck Protection Program, the Education Stabilization Fund and relief for airline workers, among others.
Another item in the textis $53 billion that stems in part from states opting to terminate the pandemic unemployment benefits early in hopes of pushing the jobless to return to work. Some 24 states stopped at least one of the federal unemployment programs before they officially ended in early September. Also, the CBO reduced its forecast for the unemployment rate because of the improving economy.
The agency also found that the Federal Communications Commission's spectrum auctions would generate far less than the $87 billion originally claimed by lawmakers.
The CBO also said that the legislation will raise about $50 billion by imposing new Superfund fees and changing the tax reporting requirements for cryptocurrencies, among other measures.
More savings would come from delaying a controversial Trump administration rule that would radically change how drugs are priced and paid for in Medicare and Medicaid until 2026, at the earliest. The measure will effectively ban drug makers from providing rebates to pharmacy benefit managers and insurers. Instead, drug companies will be encouraged to pass the discounts directly to patients at the pharmacy counter. It is currently expected to go into effect in 2023. The summary lists the savings as $49 billion and the CBO report as nearly $51 billion.
Also, the infrastructure package relies on generating $56 billion in economic growth resulting from a 33% return on investment on the long-term projects, according to the summary.
Biden has said that the legislation won't raise taxes on people making less than $400,000 a year and does not include a gas tax increase or fee on electric vehicles. He initially called for raising taxes on corporations to fund the infrastructure investments -- but that proposal did not make it into the final package after strong opposition from Republicans.
The package leaves out Biden's proposal to spend $400 billion to bolster caregiving for aging and disabled Americans -- the second largest measure in the American Jobs Plan.
His proposal would have expanded access to long-term care services under Medicaid, eliminating the wait list for hundreds of thousands of people. It would have provided more opportunity for people to receive care at home through community-based services or from family members.
It would also have improved the wages of home health workers, who now make approximately $12 an hour, and would have put in place an infrastructure to give caregiving workers the opportunity to join a union.
Also left on the sideline: $100 billion for workforce development, which would have helped dislocated workers, assisted underserved groups and put students on career paths before they graduate high school.
The legislation also leaves out the $18 billion Biden proposed to modernize Veterans Affairs hospitals, which are on average 47 years older than private-sector hospitals.
What's also out is a slew of corporate tax hikes that Biden wanted to use to pay for the American Jobs Plan.
Biden's original proposal called for raising the corporate income tax rate to 28%, up from the 21% rate set by Republicans' 2017 tax cut act, as well as increasing the minimum tax on US corporations to 21% and calculating it on a country-by-country basis to deter companies from sheltering profits in international tax havens.
It also would have levied a 15% minimum tax on the income the largest corporations report to investors, known as book income, as opposed to the income reported to the Internal Revenue Service, and would have made it harder for US companies to acquire or merge with a foreign business to avoid paying US taxes by claiming to be a foreign company.
There are some corporate tax raising provisions that Democratic lawmakers are looking to include in the separate legislation aimed at expanding the nation's social safety net.

CNN's Manu Raju contributed to this report.

Источник: [https://torrent-igruha.org/3551-portal.html]

youtube video

What's included in your FIRST LEGO League Junior Discovery package?

What’s included in this package? - Instead criticising

Package Codes

Package setup involves defining package elements, or codes, and collecting these elements into groups, or packages.  A package element is defined as an additional product or service that is sold as part of the rate or in addition to the rate. A package group is a collection of package elements. Package groups allow commonly associated elements to be defined as a single unit that can be attached to a rate code or to a reservation. An example might be a Bed and Breakfast package which encompasses a room and breakfast service for a set rate. Or, a Romance package might include champagne, chocolates, and roses as its package elements.

Each package code, or element, is set up separately and a package group would then be configured with all of the selected package elements. The package group can then be added to the specific rate code or to reservations, rather than having to select multiple package elements every time. This approach has been designed to provide you with a powerful system which can handle simple or complex package combinations. Packages have a wide range of configuration options that will drive the way OPERA posts packages and tracks allowances based on each property's needs.

Remember that you do not sell packages directly. Packages can be attached to either a rate code, to a reservation, to a block, or to a rate code and a block/reservation.

Package Lookup

Select Rate Management > Packages > Codes to access the Packages Codes screen. Or select the F5 Quick Key and choose Package Elements from the Rate Information options menu. OPERA displays the Packages Codes screen with all package elements at your property.  

Search Criteria

Use the following options to locate a configured package. Enter your options and select the Search button.

Property. Available when the OPP_MHT2 license code is active. Select the down arrow to choose the property to see packages for.

Code. Enter the package code for the package you want to find.

Fields

The following information is shown on this screen:

X. An X in this column indicates that the package has been selected for the Copy option. To mark a record, click in this column or press the space bar.  To select or un-select all packages, select the All or None buttons.

Code. Package code.

Description. Package description.

Currency. Currency used for the package. The default is the local currency.

Button Functions

Note: All function buttons are not available on this screen when it is accessed outside of Configuration. Select Configuration > Rate Management > Packages > Codes to reach the Packages Codes screen with all functionality enabled.

Copy. Available when the OPP_MHOT Multi-Property PMS add-on license code is active. Copy marked packages to other properties. When you select this option, the Property List of Values appears. Mark the properties to copy the marked packages to and select the OK button. Once copied, the package may be edited for the target property.

Rate Codes. Display a list of all the rate codes that have the currently highlighted package attached to the Rate Code Header. If the package is attached to the Rate Code Detail and not to the Rate Code Header, then the Rate Codes will not be displayed here.

Repeat. Make a copy of the package information that may be edited to create a new package. The Packages Codes - New screen appears with appropriate fields auto-populated.

New/Edit. Select the New button to create a new package. To make changes to an existing package, highlight your choice and select the Edit button. The Packages Codes - New or Packages Codes - Edit screen appears. See, Adding and Editing Package Codes, below.

Delete. Delete the highlighted package code. Package codes may not be deleted if the package is attached to a rate code. The package must first be un-associated from the rate code. Package codes may not be deleted if the package is attached to a package group. The package must first be un-associated from the package group.

Adding and Editing Package Codes

Definitions

Following are some definitions that are useful in a discussion of package setup.

  • Consumption – When a charge is posted to a guest account which is applied towards their package.
  • Profit – An amount of money that the property would receive based on the package price not being utilized by the guest.
  • Loss – An amount of money that the property would record as a loss based on the over consumption of a package by a guest. This would be a difference of the package price and the allowance amount defined.

Select Configuration > Rate Management > Packages > Codes to display the Package Codes screen. This screen lists all package codes and allows you to edit or create new ones.

Note: Packages can be selected from within the rate code configuration/editing process(Configuration > Rate Management > Rate Codes) when you select the Packages LOV on the Rate Header or Rate Details screens. The Rate Packages screen appears. Not all fields are available when editing package from within rate code configuration.

To edit a package code, highlight your choice and select the Edit button. To create a new package code, select the New button. (Alternatively, to base a new package code on an existing code, highlight your choice and select the Repeat button.) The Packages Codes - New or Packages Codes - Edit screen appears.

Package Header

Provide the following information and select the Save button.

Property. Available when the OPP_MHOT multi-property add-on license code is active, displays the property name the package code is being configured for.

Code. The code for the package. This field can contain up to 20 alphanumeric and/or symbol characters, but cannot contain any commas (,). If a comma is included as part of the name, then the "Comma sign is not allowed for the code" message is displayed.

Begin Sell Date. Available when the RATES > PACKAGE PRICING AND AVAILABILITY ATTRIBUTES application parameter is set to Y, enter/select the date to begin selling the Package. If Begin Sell Date is not entered and End Sell Date is entered, by default the Begin Sell Date is populated with current business date. See Package Pricing and Availability Attributes on Package Header Tab for details.

End Sell Date. Available when the RATES > PACKAGE PRICING AND AVAILABILITY ATTRIBUTES application parameter is set to Y, enter/select the date to end selling the Package. See Package Pricing and Availability Attributes on Package Header Tab for details.

Forecast Group. Select the down arrow to choose a package forecast group for the element.

Forecast Next Day. Select to have these package elements forecasted on the next day, irrespective if the Post Next Day check box is selected or not. Packages configured as Post Next Day only without this check box checked will not be forecasted for the next day automatically on the Package Forecast Report.

Example: An additional element of the reports functionality is the ability of OPERA to understand when a Package is scheduled for consumption. An example of this would be a Breakfast package that has been configured to 'Post Next Day' – thus consumption would not occur on the guest’s arrival date, however, the package charge is posted to the guest’s folio on the same day. The Package Forecast report would not display a Breakfast forecast for the day of arrival but rather for the following days of the guest stay if the Forecast Next Day check box is checked. Even if a Package element is not selected for Post Next Day, it can still be configured as "Forecast Next Day" and will be displayed on the report against the next business date.

B&B Rate code is configured with a Breakfast and a Bathrobe package attached. Both packages are configured as Per Person. The Breakfast package has been marked for 'Post Next Day’ and ‘Forecast Next Day’.

John Smith has an Arrival date of January 5 and will be staying for 3 nights, 2 guests will be in the room. He has booked the B&B rate code. The package forecast breakdown would display as follows:

DATE BKFST BATH

01/05/02 0 2

01/06/02 2 2

01/07/02 2 2

01/08/02 2 0

Short Description. Brief description of the package (F&B, Robe, Flowers, Chocolate Surprise).

Tip: Select the Globe button next to this field to open the Multi-language Descriptions screen and configure a language translation for the package short description. Using the Multi-language Descriptions screen, select Edit (to edit an existing translation) or New (to add a new translation), select a language for the Language field and enter a short description into the Description field. Select OK to save the language translation. During a Fetch Available Packages or Fetch Booked Packages request, this translated description will be returned in the response to the WEB or ADS channel when querying a package item or checking its availability.

Description. This field is used to contain the full description of the current package element. If you have multiple rates for items such as breakfast, it can be quite useful to include the amount in the description so you can quickly see which package you should use (example: Bfast10, Bfast15, etc.).

Catering. Available when the when the application function Catering Events is set to Y, this option should be checked for all PMS packages that typically are also represented by a catering event (or partially represented by a catering event). For example, a Group Breakfast that may be included in the room rate, but for which also a catering event gets created if the group takes the breakfast as a unit (e.g., in a catering function space).

Because the revenue for these types of packages is usually represented twice, once in the catering revenue stream and once in the PMS revenue stream, this flag indicates that the revenue from this package should only be counted once (in the catering revenue stream). The revenue for this package element in the PMS revenue stream will be suppressed on the Business Block Summary screen.

Resync. (Available when an OXI interface is present). Use this button to synchronize individual packages to one or multiple OXI Interfaces directly from the Package Header or Package Detail screen. When selected, this option displays the Interface IDs screen. Note that only active OXI Interfaces are available for selection from this screen. Select the available OXI Interface to sync the current record to, then select OK. Once the record has completed synchronization with OXI, a message displays verifying that the message was sent to OXI. See OXI Resync for OPMS for more details.

Long Info. Displays a long information text box where useful detailed information can be entered and saved regarding this package.

Arrangement Code. Available when the CASHIERING > PACKAGE ARRANGEMENT CODES application parameter is set to Y. Select the down arrow to choose the package arrangement code to which this package is to be linked.

Note: If a package rate code is associated with an in-house reservation, or has been manually posted to an in-house reservation, the Arrangement Code field on the package header for that package is disabled.

For an existing package without an arrangement code, add the arrangement code and select Save. The field will still be editable. Only after closing out of the screen and coming back in is the field is grayed out.

If a package is linked to a package arrangement code, package postings are grouped on the folio by package arrangement code when printing the following folio styles:

1 - Detailed Folio (Date)

9 - Detailed Folio (Room)

14 - Summary by Check No (Date)

Note: If no check number applies, the arrangement code is observed; otherwise, transactions with check numbers will be grouped by Reservation, check number and date.

15 - Group Folio Subtotal (Date)

16 - Group Folio Subtotal per Guest (Date)

18 - Group Folio Subtotal per Room (Date)

See Package Arrangement Codes under the Folio Groupings topic for details.

Ticket. Available when the TIK (Tickets) interface is active, select to indicate that the package is a Ticketing Package. This type of package will include tickets (Train Ride, Amusement Park Entrance, Show Admittance, etc.) with the reservation. Ticket packages can be configured as Included in Rate, Sell Separate, or Add Rate Separate Line packages. See Tickets for details.

Note: When a package is setup as a Tickets Package, the Posting Rhythm can only be Post Every Night, Post Arrival Night, or Ticket Posting. A Ticket Package can be setup to Sell Separate and Add Rate Separate Line, even when the Posting Rhythm is not set to Ticket Posting. This enables the ticket package to be included in the Rate Information as part of the total cost of the stay.

Transaction Details

Code. Select the transaction code that will be used to record the package price.

Note: Only Revenue subgroup transaction codes are available for selection; Payment transaction codes and Wrapper transaction codes are excluded from this list of values.

This code will not be able to be changed for same day or next day packages because an allowance could be created on that transaction code for inhouse reservations. In this case, a message prompt would be displayed to notify the user of the situation and why the transaction code could not be changed.

Overage. (Available when the RATES > ADVANCED PACKAGES application function is set to Y.) If a higher amount than is covered by the package allowance is posted, the overage is posted to the guest's folio. Select the down arrow and choose the transaction code that will be used to record the amount that is consumed over the Allowance amount of the package (set on the Package Detail tab).  If this field is left blank, any overage is posted to the transaction code to which the allowance was posted (i.e., the transaction code in the Code field or one of the codes in the Alternates field).

Tax Inclusive. Mark the associated check boxes to indicate if the generates associated with the transaction code selected should be inclusive or exclusive.

Alternates. (Available when the RATES > ADVANCED PACKAGES application function is set to Y.) Select transaction codes that can be used as alternatives to the main package transaction code (in the Code field) for this package. For example, the package may be for restaurant breakfast food (transaction code 2000) and have transaction code 3000 listed as an Alternate transaction code, but the guest may consume the same amount for room service breakfast without penalty (transaction code 3000). This field is especially helpful for point of sale systems. To build the list of alternate transaction codes for a package click the Alternates field drop-down arrow. Select the appropriate codes from the Available Codes list to move them to the Selected Codes list. You can reverse the action Removing codes from the Selected Codes list to move the item back to the Available Codes list. Note that the package accepts postings from alternate transaction codes and the revenue will be posted for that alternate package transaction code.

Incl. Qty. in Rate. (Available only when the package is being configured as part of a rate code. See Rate Header screen for details.) Number of package elements included in the rate.

Allowance. (Available when the RATES>ADVANCED PACKAGES application function is set to Y and the Ticket check box is not selected.) Select this check box if it is expected that charges will be received from an external interface (e.g., a POS) and these charges need to be offset against a consumption allowance amount.

Changes to packages that have the Allowance check box selected are not permitted if the package is attached to a reservation (either directly attached to the reservation or attached by virtue of the rate code associated with the reservation) that is checked in.

Allowances are commonly used for point-of-sale transactions such as dinner or breakfast where a charge can be expected back to the guest account. Rather than having to inform your outlets of what guests are staying on which packages, each guest can simply charge back to their room. OPERA will then determine if package allowances exist and consume the charge against that package price. Any overage, above the allowance amount will be posted as an overage charge to the guest’s account. But if a negative amount is entered to be posted against the package allowance, then this amount is added and the package allowance amount will be increased by this value.

This check box must be selected if Post Next Day is selected.

The Price of the package and the Allowance amount are specified, per effective date ranges, on the Package Detail tab.

Note: The package Allowance attribute set on the Package Codes - Edit screen may not be changed once the package has been attached to a rate code header or detail on the Rate Setup screen. Similarly, the Allowance attribute may not be changed if the package has been selected in the Reservation screen Packages field for a Checked In reservation.  The package Allowance attribute can never be changed on the Rate Packages screen (see Rate Packages Screen, below) accessed from the Rate Setup screen.

Examples with Allowance

Continental Breakfast – The actual price is $25, but the guest is only charged $15 as he is staying at the property.

Price is $15. This is the amount that is either deducted from the rate or added to the rate (based on the Add to Rate configuration).

Allowance is selected.

Allowance is $25. This is the amount of the actual breakfast charge. Therefore, the property will show a package loss of $10 at the most.

In the above case, if the guest charges a full American Breakfast of $35 to his room, than the $10 overage ($25-$35) will be posted to the guest account, and the property will have a package loss of $10.

Champagne – The price of champagne ranges from $10 and $20, depending on the type of champagne chosen by the guest.

Price is $10. This is the amount that is either deducted from the rate or added to the rate (based on the Add to Rate configuration).

Allowance is selected.

Allowance is $20. This is the gross amount that the guest can consume without being charged. Therefore, the property should show a loss of $10 at the most.

In the above cases, if the guest consumes more than the Amount set for the package, the amount over will be added to the guest’s folio.

Examples without Allowance

Valet Parking – The actual price is $5.

Price is $5. This is the amount that is either deducted from the rate or added to the rate (based on the Add to Rate configuration).

No Allowance is selected.

Bucket of Golf Balls – The actual price is $7.50.

Price is $7.50. This is the amount that is either deducted from the rate or added to the rate (based on the Add to Rate configuration).

No Allowance is selected.

In both of the above cases, a charge will not come through an interface, or be posted to the guest account, however, the guest is still getting charged. The charge for the bucket of golf balls is posted to a package account, not to the guest account. There would be no consumption against a package amount.

Valid until C/O EOD. Available when the CASHIERING > CONSUME ALLOWANCE WHEN NO POST OR Post Stay Flag application parameter is set to Y and the Allowance check box is selected, the package allowance for the departure date will remain available on the reservation after it has checked out until the End of Day process is run for the business date. In other words essentially this flag will control that on the day of departure, if the Package Profit/ Loss for any allowance package should be created upon check out or allowance should remain available past checkout until the End of Day. See Package Allowance Consumption for No Post Reservations or Package Allowance Consumption for Checked Out Reservations for details.

Profit. (Available when the RATES > ADVANCED PACKAGES application function is set to Y.) Select the transaction code to be used when recording any profit from unconsumed allowances. (Available only if Allowance is selected.)

Loss. (Available when the RATES > ADVANCED PACKAGES application function is set to Y.) Select the transaction code to be used when recording any package loss from over-consumed allowances. If the guest consumes a higher amount than the item price but below the allowance amount, the difference between the item price and the guest consumption amount is the package loss.  (Available only if Allowance is selected.)

Note: If the IFC > IFC POST EXCLUSIVE TAX AS ITEMIZER application parameter is set to Y, exclusive taxes associated with profit/loss transaction codes of package elements will be posted as itemizers, that is, as separate items. (The transaction code for the tax must have a Transaction Type of Tax.)

Currency. Select the down arrow to choose the currency for this package. (This feature is available when the GENERAL > MULTI CURRENCY application function is set to Y.) Allowance packages and non-allowance packages set up in one currency cannot be attached to rate codes, reservations, and blocks configured in another currency.

Note: The GENERAL > MULTI CURRENCY application function may not be set to N (deactivated) if different currency associations exist between packages and reservations, rate codes, or Business Blocks.

Redemption. Available when the OPR_<version number> OPERA Reservation System and the OIS_<version number> OPERA Information System license codes are activated, this check box will display. Marking the Redemption check box means that this rate allows points to be redeemed at the time a reservation is booked (used only for Sweden at this time). The ORS reservation specialist can quote all available rates that a guest can spend membership awards points on at the time of reservation.

Note: When the Redemption check box option is selected and the package code is copied to other properties, the redemption option will be copied to the properties along with the point details for the package.

Attributes

Included in Rate. No separate charge appears on the guest folio or reservation. The amount is internally deducted from the room rate amount for inclusive packages.

(Available when the OPR_<version number> OPERA Reservation System license is active, when the mandatory Background Processor process of Update Statistics is run, package revenue configured as Included in Rate (not selected as Add-on), is included in the Room Revenue column of the reservation_stat_daily table. If the user wants to identify and display the Included in Rate package revenue (not selected as Add-on) in the Package Room Revenue column, the user can activate an application setting. Activate ORS > Global > Rate > Add Included Package In Room Revenue = Y.)

For non-inclusive packages, there is a charge that is separate from the room rate. The charge can be posted on a separate line or added to the room rate, depending on whether Add Rate Separate Line or Add Rate Combined Line is selected.

Add Rate Separate Line. If selected, this charge will be added to the room rate amount and printed as a separate line on the folio. Selecting this checkbox is very useful when the package element is not included in the rate (for example, US taxes). If you select this check box, the example below would appear for the guest:

January 3, 2020

Package

200.00

January 3, 2020

Breakfast

20.00

Note: When creating a package, users are not allowed to select both the attribute 'Add Rate Separate Line' radio button and the 'Allowance' check box. Trying to complete this action will display the following message: You cannot select both Print Separate and Allowance.

This functionality is intended for the following reasons:

-Allowances are part of packages and they must always be grouped together and internally also handled in this manner.
-Allowance details including price can be seen within reservations options called 'Package Options' if need to be.
-Also displaying an allowance rate in a separate line would allow guests to see the allowance price on guest folios, which may not be desirable for most hotels.

Add Rate Combined Line. If selected, this charge will be added to the room rate amount and printed on the same line as the room charge on the folio. If you select this checkbox, the example below would appear for the guest:

January 3, 2007

Package

220.00

Sell Separate. If selected, this element can be attached directly onto a reservation. When adding a package directly to a reservation, the room rate field will show the main rate code rate and indicated to the right is the room rate including the packages added to the reservation. If this check box is not marked, the only means in which this package can be available is via the Rate Code.

Note: When the OEDS > Parameters > ADVANCED OWS PRODUCTS application parameter is set to N, all package codes that have the Sell Separate check box selected will be available for web bookings. However, if the ADVANCED OWS PRODUCTS application parameter is set to Y, only package codes that have both the Sell Separate and the Web Bookable check boxes selected will be available for web bookings.

Post Next Day. (Available when the RATES > ADVANCED PACKAGES application function is set to Y.) If selected, this element is consumed the following day and the allowance is not posted until the End of Day Routine. For example, the property might allow the consumption of a breakfast package the morning after a stay. (Allowance must be selected in order to activate this feature.)

Web Bookable. (Only displayed when the OEDS > Parameters > ADVANCED OWS PRODUCTS application parameter is set to Y.) Select to make this package code available for web bookings.

Note: Both the Web Bookable and Sell Separate check boxes must be selected in order for the package code to be available for web bookings.

Calculation Rule. Select a value from the list of values to indicate the calculation rule for this package. This field is used to determine how the package amount should be calculated. You have the following options:

  • Flat Rate (price posted as flat rate, regardless of number of guests). Flat Rate is per sharer in the room. Each share-with in the room will be charged the flat rate amount.
  • Per Person (price times number adults plus number of children).
  • Per Adult (price times the number of adults).
  • Per Child (price times number of children). With the selection of this calculation rule and the Rates > Rates By Defined Buckets is set to Y , packages can be setup with different amounts per child bucket on the Package Details tab.
  • Per Room (price times number of rooms). The Per Room calculation is applied to the room. If a reservation is shared, instead of applying the package per reservation, it considers it for that room. When a package is configured with an Allowance and a Per Room calculation rule, this will enable a property to restrict the amount of Allowance for Shared Reservations. The Allowance will always be attached to the Primary Sharer's (identified by OPERA, not by the RESERVATIONS > PRIMARY SHARE application parameter) reservation and can only be used during the Primary Sharer's reservation. So if the Shared Reservations are staggered, the allowance will only be available until the Primary Share reservation checks out.

    For Example, the following scenarios can be configured by setting up a Per Room calculation rule with an Allowance:

    Example 1

    Rate Code: PKG = 100.00

    Package = LUNCH (Price = 20.00, Allowance = 20.00)

    A non-sharer reservation using this package, would have an allowance of 20.00 (Room = 80.00, Lunch 20.00, Allowance = 20.00)

    Example 2

    Rate Code: PKG = 100.00

    Package = LUNCH (Price = 20.00, Allowance = 20.00)

    Sharer 1 = Entire Rate 100.00

    Sharer 2 = Zero Rate 0.00

    Sharer 1 is the Primary Sharer. Sharer 1 will have the allowance and price.

    Room = 80.00, Lunch = 20.00, Allowance = 20.00

    Sharer 2 has 0 rate and can share the allowance on the Primary Share. If a posting is made for LUNCH for Sharer 2, then this is posted against the Primary Sharer's allowance.

    Example 3

    Rate Code: PKG = 100.00

    Package = LUNCH (Price = 20.00, Allowance = 20.00)

    Sharer 1 = Full Rate 100.00

    Sharer 2 = Full Rate 100.00

    Sharer 1 is the Primary Sharer. Sharer 1 will have the allowance and price.

    Room = 80.00, Lunch = 20.00, Allowance = 20.00

    Sharer 2 has Full Rate. Sharer 2 can share the allowance on the Primary Share. If a posting is made for LUNCH for Sharer 2, then this is posted against the Primary Sharer's allowance.

    Room = 100.00, Lunch = 0.00, Allowance = 0.00

    Example 4

    Rate Code: PKG = 100.00

    Package = LUNCH (Price = 20.00, Allowance = 20.00)

    Sharer 1 = Split Rate 50.00

    Sharer 2 = Split Rate 50.00

    Sharer 1 is the Primary Sharer. Sharer 1 will have the allowance and price.

    Room = 30.00, Lunch = 20.00, Allowance = 20.00

    Sharer 2 has Split Rate. Sharer 2 can share the allowance on the Primary Share. If a posting is made for LUNCH for Sharer 2, then this is posted against the Primary Sharer's allowance.

    Room = 50.00, Lunch = 0.00, Allowance = 0.00

In the breakfast example you would probably choose Per Person unless children eat breakfast for free, in which case we would probably choose Per Adult. If the package element was for valet parking you would probably choose Flat Rate.

Note: For staggered sharer stays, since there can be only 1 primary sharer reservation per night, the allowance will be created on that primary sharer reservation for the night and other shared reservations will share it. In the event the reservation with allowance is checked out prior to the other shared reservations, the allowance for that date will not be available for consumption by other shared reservations.

Valid Between/And. (Available when the RATES > ADVANCED PACKAGES application function is set to Y.) Enter the start and end times during which the allowance defined in the package element is valid. If you leave the fields blank, the allowance is valid all day. For example, if breakfast is being served between 07:00 and 10:30, you should allow breakfast postings to the allowance only during this period. If a breakfast posting is made at a later time, the amount would be posted to the guest's folio. Remember that the time of posting is the time the waiter charges to the room from the Point of Sale system, not necessarily the time when the guest started breakfast.

Posting Rhythm. Select the posting rhythm to be used to determine the frequency of the package posting. OPERA provides a variety of posting rhythms. Most posting rhythms are based off of the actual arrival date of the reservation. See Package Posting Rhythms for details.

Formula. System administrators or your OPERA installer can use SQL-type expressions to create a special posting condition for special packages. For example, if a package element posting rhythm calculation requires more than the standard posting rhythm options, you can enter a special rate formula in this field. (See User Definable Functions for some package functions that can be added in this field.)

An example of a package formula is perc 125 15. With this formula, a 12.5% VAT will be extracted from the gross amount, and a 15% service charge will be calculated on the net amount.

When a formula is entered in the Formula field for the package, the following changes will be automatically applied:

  • Specific fields that are not applicable will be grayed out (i.e., Overage, Allowance, Post Next Day).

Formula calculated types of packages cannot be added to a Package Group and cannot be selected from the Package field in the reservation. The Rate Info screen and the posting routines will reflect this package and post it correctly.

In PMS, when a package with an invalid formula is sent to ORS, the message will be processed with a warning in OXI-HUB. The formula will be removed from the package, but the package will still be inserted into ORS. When a package with an invalid formula is attached to a rate code, whether in PMS or ORS, the same behavior will occur.

Note: You can still set the Calculation Rule, Type, Item Price, etc., to some other value when the Formula field is populated. When the function price is calculated, OPERA overrides these values.

Minimum Advance Booking. Enter the minimum number of days (between 1 and 365) that a reservation arriving on this date must be booked in advance. This field will be available only for packages that are marked as Sell Separate, and will be carried over to the package header attached to the rate header and can be modified for that specific rate code / package code combination.

When associating these packages with a reservation either manually/directly or via a rate code, and the package has the specific Minimum Advance Booking value ‘X’ days, the business date when the package is being associated must be at least ‘X’ business days before the first date when the package is applicable (first consumption date). An actual date when the package could be applied during the stay is more reliable and appropriate criteria for validation, as OPERA has several different types of Posting Rhythms due to which package may not be applicable starting on the arrival day itself. For example, a package is configured as 'Post on Last Night' and has Minimum Advance Booking days of 5. If on January 1, 2014, a reservation is being made for January 5 to January 16, 2014, this package can be associated with the reservation any time until January 10, 2014, as it will be consumed only on the night of January 15 (last night of stay) and therefore there will be a gap of 5 days satisfying the Minimum Advance Booking days of 5.

If a package is being attached manually to a reservation, then it will not be shown in the Packages LOV if this condition is not satisfied. If a package is being attached via a Rate Code, then OPERA will automatically not attach it if this condition is not satisfied. For example, if a Sell Separate package with Posting Rhythm of Every Night has 10 as the Minimum Advance Booking days specified, then if a booking is being made on January 10, 2014 for arrival date of January 15, 2014 (also the 1st consumption date), the package cannot be attached to the reservation either manually or via rate code. However, if booking is for the arrival date of January 21, 2014, then the package can be attached to the reservation either manually or via a rate code.

If several packages are used to create a Package Group and it is marked as Sell Separate, when attaching a package directly to a reservation, the package group code will be excluded if any one of the packages does not validate the Minimum Advance Booking days (i.e., all the packages in a package group must be available for the package group to be included in the LOV). When the same package group is attached to a rate code, and a reservation is created for this rate, the package group code will be excluded if any one of the packages does not validate the Minimum Advance Booking days (i.e., all the packages in a package group must be available for the package group to be included in the LOV).

For a block header for Business Blocks, the restrictions based on the Days of the Week and Minimum Advance Booking will not be applicable. Users can attach any available package per existing functionality. The package may be inherited or not based on the reservation’s arrival/departure date once a reservation is created for the Business Block. This can be thought of in the same terms as attaching a package to the Rate Header / Rate Details and then creating a reservation using this rate code, where depending on the existing and the new validations being met, a package may be attached to the reservation or not.

Item Inventory. Available when the RESERVATIONS > ITEM INVENTORY application function is set to Y. Select the ellipsis button to choose one or more items to be included in the package. (See Item Inventory Setup for details on setting up items.) When you select the ellipsis, the Item screen appears. To add a new item to the package, select the New button. To edit an existing item, highlight your choice and select the Edit button. On the New/Edit Item Quantity screen select the item and the quantity. The default quantity is 1.

Rate Attributes and Rate Code Amount Posting

The following describe scenarios when a Package Wrapper transaction code is posted to the guest’s folio:

1. If a rate code contains an 'Add Rate Combined Line' or an 'Included in Rate' package which is applicable for the night, then the package wrapper transaction code will be used to post the rate code amount.

2. If a rate code contains an 'Add Rate Separate Line' package, then the package charge will post using the transaction code configured on its package header, and the room charge will post using the room transaction code. In this case, the package wrapper transaction code will not be used regardless of whether the package is attached to the rate code or added to the reservation/block.

3. If a rate code contains packages which are all set up as 'Add Rate Separate Line', then the package charges will post using the transaction codes configured on their package headers and the package wrapper transaction code will not be used.

4. If a rate code contains packages with one 'Add Rate Separate Line' applicable for the night and another 'Included in Rate' applicable for the night, then the package wrapper transaction code will be used to post the rate code amount. The 'Add Rate Separate Line' package will be posted separately and display separately on the billing screen. This posting behavior occurs whether the packages are added separately or as part of a package group.

5. If a rate code contains a package that is configured with a 'Floating Allowance per Stay' posting rhythm, then the package wrapper transaction code will be used to post the rate code amount for all dates of the stay.

For more information on packages attached to rate codes, see the Rate Header Tab topic. For more information on package transaction posting, see the Package Ledger System Case Studies topic.

Package Detail

Use this screen to enter package prices and allowances based on season or date ranges. If a formula has been entered, all the detail information will be overridden by the formula.

Note: When you are attaching a package directly to a rate code header, you may specify different date ranges and prices that will override the default prices and date ranges for that period configured for the package. These prices and date ranges will apply only to the rate code to which the package is attached. When attaching a package directly to a rate code detail, these alternate dates and prices cannot be modified.

Season Code. Displayed when the RATES > RATE SEASONS application function is set to Y, select the down arrow to choose a season code.

Start/End Date. Enter the start and end dates for the price/allowance or use the calendar tool to select dates. Date ranges cannot overlap. By default, the package code is valid for a ten-year period starting on the date it is configured. Dates default to the dates defined for the season if Season Code is selected.

Days of the Week check boxes. Days of the week for which the specified package price and allowance may be sold. Mark the applicable days for each package detail for the dates defined. The check boxes automatically default with each day marked for convenience. The Days of the Week values cannot be unchecked while there are package details created for specific days of the week.

The following example screen shows that for the date range of February 8, 2014 to March 8, 2014, on Sunday, the price of the package is 10.00 and allowance is 10.00:

packages_codes_edit

This also means that for the same date range, the package is available only on Sunday. You can select all other check boxes or specific ones to indicate the availability of the package on any other day of the week for the same date range and for the same price/allowance.

If the package price and allowance need to be different for any other days of the week for the same date range, then another package detail record should be created as shown below, for example, on Wednesday and Friday if the price and allowance need to be 11.00, then the following should be configured:

packages_codes_edit2

OPERA will validate that the date range and days of the week do not overlap. If a package detail is not configured for specific days of the week within any date range, then OPERA will consider the package to be unavailable for these days of the week while checking for package availability when the user searches for it or attaches it to a reservation. Based on this configuration, a reservation from March 1, 2014 to March 8, 2014 will have a package associated for Sunday at 10.00 and Wednesday/Friday at 11.00. The package will not be associated for the other days of the stay as it will be considered unavailable for other days of the week that are not checked.

Price. The actual price of the package element. This amount will be posted to the transaction code defined under Transaction Code. (Price cannot be negative when the package has an allowance.)

Note: The amounts entered in the Price and Allowance fields will be in the currency defined in the package header.

Allowance. If the package has an allowance, amount of the allowance. This is the amount which the guest can consume against. This amount is the actual price for the element or the allowed consumption price for the guest.  The allowance cannot be less than the price.

Note: When performing an early departure for a reservation, the exclusive tax for package price posted to the guest folio for the current business date due to consumption of a package will be reversed. When consumption is moved to the guest folio, appropriate exclusive tax on the consumed amount is reposted based on the generates attached to the package price. If a bill number has already been assigned to this exclusive tax for package price posting on the guest folio, when consumption is moved to the guest folio, appropriate exclusive tax on the consumed amount is reposted based on the generates attached and also a reversal posting for the previously posted exclusive tax for package price.

When the RATES > RATES BY DEFINED BUCKETS is set to Y and the Calculation Rule is set to Per Child on the Package Header tab, packages can be setup with different amounts and allowances per child bucket. Different buckets can be configured where packages/products are priced depending on the child’s age bucket. The functionality will allow the same package to be used for different child buckets with different prices. The age range for each bucket are configured from the Rates > Min and Max Age Rate Bucket 1-3.

package_detail_child_rate_buckets

Package Pricing & Availability Attributes on Package Detail Tab

Available when the RATES > PACKAGE PRICING AND AVAILABILITY ATTRIBUTES application parameter is set to Y and the Redemption check box is not selected on the Package Header, Minimum and Maximum value fields can be specified for the number of Nights and Persons for each specified date range. See Package Pricing & Availability Attributes on Package Details Tab for details.

Rate Packages Screen

When you are working from the Rate Setup screen (Configuration > Rate Management > Rate Codes), you may attach package elements and/or package groups to the rate code. Packages can be selected from within the rate code configuration/editing process when you select the Packages LOV on the Rate Header or Rate Details screens. The Rate Packages screen appears.

When a package is attached to a rate code, the following fields on the package header screen will be grayed out since these are the only fields that when updated on the package header will automatically reflect on the package header attached to the rate code.

  • Short Description
  • Forecast Group
  • Transaction Code
  • Profit code
  • Loss code
  • Overage code
  • Sell Separate check box
  • Arrangement code (available only when Package Arrangement code parameter is active)

The fields that are not grayed out on the package header attached to the rate code allow editing to provide greater flexibility and control over package configuration per rate code.

Please also note that depending on certain restrictions in place (such as an in-house reservation using this rate code with the package having an allowance), only certain fields that are not grayed out on the package header of the package attached to rate code can be modified.

package_detail_screen_from_rate_header

Package Details Grid

The grid displays details pertaining to the package that includes the Start and End Date, the Price, and the Allowance that has been configured for it.

Package Detail Exceptions Grip

This grid displays exceptions that may exist for the package, which can include a different price for the package for specific dates. Also, new exceptions can be created for the package by simply clicking in the grid, selecting the New button, and filling in the required fields.

Package Availability Verification when Modifying Reservations

OPERA verifies the availability of the package once a reservation is modified. The availability is checked primarily on the basis on the Posting Rhythm, Start and End Dates on the package details, the Calculation rule, Days of the Week check boxes, and the Minimum Advance Booking value. Any packages that do not remain applicable upon change are either removed or certain modifications on the reservation itself may not be allowed. If the item inventory for any of the already attached packages is not available for the changed date range, the user will be prompted accordingly. Packages can be removed after the user’s response, or the change on the reservation may not be allowed. For example, for reservations where Advance Bill has been generated, OPERA does not allow making changes to already applied packages.

Adding and Editing Package Codes



Источник: [https://torrent-igruha.org/3551-portal.html]

What’s a Package?

If you’re new to packaging, you can think about a package as a container that you fill with metadata. It contains a set of related features, customizations, and schema. You use packages to move metadata from one Salesforce org to another.

Each second-generation managed package follows a distinct life cycle. You add metadata to a package, and create a new package version. While the package is continually evolving, each package version is an immutable artifact.

A package version contains the specific metadata and features associated with the package version, at the time it was created. As you iterate on your package, and add, remove, or change the packaged metadata, you create many package versions.

You can install a package version in a scratch, sandbox, trial, developer edition, or production org. Installing a package version is similar to deploying metadata. Each package version has a version number, and subscribers can install a new package version into their org through a package upgrade.

You can repeat the package development cycle any number of times. You can change metadata, create a package version, test the package version, and distribute it to your customers via AppExchange. This distinct app development life cycle lets you control exactly what, when, and how your metadata rolls out. In the installed org, you can inspect which metadata came from which package and the set of all metadata associated with a specific package.

Источник: [https://torrent-igruha.org/3551-portal.html]

ALL INCLUDED PACKAGE: Ends 1/22/22. Available only in the U.S. (excludes Puerto Rico and U.S.V.I.). 1st & 2nd year Pricing: $64.99/mo for ENTERTAINMENT All Included; $69.99/mo for CHOICE All Included; $84.99/mo for ULTIMATE All Included; $134.99/mo for PREMIER All Included for first 12 mos. only.  After 12 mos. or loss of eligibility, then prevailing rate applies (currently $102/mo for ENTERTAINMENT All Included; $122/mo for CHOICE All Included; $151/mo for ULTIMATE All Included; $206/mo for PREMIER All Included), unless cancelled or changed prior to end of the promo period. Pricing subject to change. $5/mo. discount: Must enroll in autopay & paperless bill within 30 days of TV activation to receive bill credit starting in 1-3 bill cycles.  First time credit will include all credits earned since meeting offer requirements.  Must maintain autopay/paperless bill and valid email address to continue credits.  No credits in 2nd year for autopay/paperless bill.  Includes: All Included TV Pkg, monthly service & equipment fees for one Genie HD DVR, and standard pro installation. Additional Fees & Taxes: Price excludes Regional Sports Fee of up to $9.99/mo. (which is extra & applies to CHOICE and/or MÁS ULTRA and higher Pkgs.), applicable use tax expense surcharge on retail value of installation, custom installation, equipment upgrades/add-ons (min. $99 one-time & $7/mo. monthly fees for each extra receiver/DIRECTV Ready TV/Device), and certain other add’l fees & charges. See att.com/directvfees for additional details. Different offers may apply for eligible multi-dwelling unit and telco customers.

Источник: [https://torrent-igruha.org/3551-portal.html]

Package Options

Packages are used to provide guests with amenities and services in a way that is attractive, convenient, and highly marketable. Packages can be attached to a rate code and included in the room rate, they can be sold separately and attached to the reservation, or they can be available under both arrangements. A "Bed and Breakfast" package is an example of a package that incorporates a room plus breakfast service for a single set rate amount. A "Golf Holiday" package might include a half-day golf cart rental and greens fees at a reduced rate. The package could be made available to guests as part of their room rate or separate from their accommodations. (See Packages for full details on how packages are set up and managed.)

Packages can have an allowance associated with them. The allowance is the amount of goods or services represented by the package that the guest is permitted to consume. Any consumption above the allowance is called an overage for which the guest is billed. Entries on the Package Options screen let you trace the consumption of each package which provides an allowance to the guest.

If the package does not include an allowance, no entry appears on this screen. For example, a "Romance" package — champagne, chocolates, and flowers — might post an $80 charge to the guest's bill during Night Audit. Consumption is fixed, so no allowance is involved and no entry appears for this package on the Package Options screen. Or, the package might simply add a flat charge to the guest's room rate; for example, a $20 charge for the "Deluxe Robe" package might be reflected in the guest's $350 room charge. (The package cost may be broken out separately on the guest's folio, depending on how the package is configured.) Again, no entry for this package would appear on the Package Options screen.

The Package Options screen is accessible from both the Reservations module and from the Cashiering module. From the Reservation screen or from the Billing screen, select the Package Options button from the Options menu to access the Package Options screen.

Package elements are identified by their transaction code and description. Entries are sequenced by their date and transaction code. Separate entries tell you the allowance provided by the package; the amount of the allowance consumed by the guest; and, if the guest has consumed an amount in excess of the allowance, the amount of overage. The overage is charged to the guest's bill.

Note: When you manually post charges to a transaction code that is included in a package assigned to the guest, a message asks you whether you want to apply the charge to the package allowance. If you select Yes, the charge is posted against the package allowance. If you select No, the charge is posted to the guest's bill and is not subtracted from the allowance.

When posting a negative amount and Yes is selected on the message, then this amount will be added to and will increase the package allowance amount.

A green shaded row summarizes the postings against each package for each day of the stay. Related taxes applicable to the package are marked by in a separate green-shaded summary row. Individual posting records for the package on that day follow the green shaded row.

Rate Code. Rate code to which the package is attached.

Package. Package code.

Code. The transaction code attached to the package element.

Description. The description of the transaction code.

Date. The date the transaction was posted against the package.

Allowance. The amount allowed by the package, in local base currency. OPERA adds the allowance entry automatically at check-in or during Night Audit. When multiple packages that have the same Product and Transaction Code are attached to a reservation, the allowance amounts will be combined into one line item.

For Example

Package 11ABK (with 1234 Trx. Code) has been attached to the ARACK Rate Code in configuration and has an allowance of $16.28. So when a reservation is checked in with the ARACK Rate Code , the package options screen will show one line for this package for that specific date with allowance of 16.28. If the same package is added to the reservation manually, it will create another allowance for 16.28.

The Package Options screen will display one line item to summarize this, i.e. a total allowance of 32.56. Each of the postings made to trx. code 1234 that consume allowance will be shown separately, i.e. 2 postings of 14.95, in this case. See image below.

multiple_allowances_on_one_reservation_package_options

Note: When a reservation share exists that uses the same rate code with a package and have assigned the total room rate charge for all sharers to a specific sharer with the Entire option, the Allowance will not be posted to the reservation until the Share that has been assigned the charges is Checked In.

For Example
Create a reservation with rate code PKGRATE, this rate code has a BFST package with per person allowance of $20.00.

Create a share reservation for 1 adult with this rate code. Within the Sharer screen, place cursor on first/primary share and select the Entire option.

Select the second sharer (i.e., the reservation with 0.00 rate) and check it in.

Front Desk > In House > Search and select the second share > options > Package Options. There will be no allowance created.

Select the first/primary share; Check it in > Reservation Options > Package Options > this share shows $40.00 allowance which is the allowance for both shares.

When negative postings are made against a package allowance, manually in OPERA or from a POS system, OPERA will first post an offset transaction to adjust the overage generated for that package. If there is any amount remaining, after adjusting the overage amount, then it will be applied against the original allowance which could result in an increased allowance on that package. Essentially making a negative posting against allowance transaction code will offset any overage first before increasing the package allowance.

Only an overage for the same business date that was posted as a negative posting will be adjusted for same day and next day packages. Once the business date is rolled, the overage for the previous business date will not be offset. However for the case of floating allowance packages, an overage posted on any date during stay will be offset, as the allowance is for the entire stay and not for any specific date of stay.

When an overage transaction is posted to a billing window, the reference will now include the package code that generated the overage transaction. Similarly, the offset transaction will have a reference as Overage Reversal including the package code that generated the overage transaction.

For Example
Reservation Details
Rate Code = RACK/Package Code = BFST
Package Price = $10.00 and Allowance = $10.00 on trx. code 2003
1. $20.00 posted against the allowance. Message prompt "Do you want to post against the allowance?" is displayed in OPERA. No message in POS and action is automatically taken. $10.00 is then displayed on the guest folio as an Overage.
2. Negative $20.00 is posted against trx. code. 2003. OPERA will check for an overage made to transaction code 2003. In this case, the Overage posted to the guest's folio will be posted against.
The remaining $10.00 is then posted as an offset/negative consumption against the original $10.00 that was consumed for the package.
This leaves the original allowance amount of $10.00 available for the package.

If multiple package allowances exist on the reservation that have the same transaction code, OPERA will look at the first package that has the specified transaction code with the negative posting to offset the allowance.

Note: Only the 1st package will have the entire offset amount applied to it. OPERA will NOT apply any equivalent offset amounts to all the packages.

For Example

If 2 packages have allowances for $20.00 and $40.00 on transaction code 2000.

Posting $20.00 on transaction code 2000 will consume the 1st allowance from the 1st package.

Posting $45.00 on transaction code 2000 will consume the 2nd allowance from the 2nd package, and will also create an overage of $5.00.

Now if a negative posting is made on transaction code 2000 for $50.00. 1st the $5.00 offset is posted for the overage and then the remaining $45.00 is applied to the 2nd package that created the overage. So the Package options screen would like below where 2nd package has a -$5.00 as the posted amount thus increasing the allowance to a total of $45.00.

negative_posting_against_allowance_4

Posted. The amount applied toward guest consumption of the package. The amount posted is subtracted from the allowance. The posted amount is considered to be included in the package and is not shown on the guest's bill.

Note: Once a posting has been made against a package allowance, the amount posted will not reflect any subsequent change in the exchange rate.

Overage. The amount, if any, of charges above the package allowance. This amount is added to the guest's bill.

From Room. Available when the CASHIERING > PACKAGE ALLOWANCE LINKING application parameter is set to Y. The room where the posting originated. Blank if the posting originated in the current room. See Package Allowance Linking, below.

Used Room. Available when the CASHIERING > PACKAGE ALLOWANCE LINKING application parameter is set to Y. The room whose allowance was used. Blank if the current room's allowance was used. See Package Allowance Linking, below.

Others. Available when the CASHIERING > PACKAGE ALLOWANCE LINKING application parameter is set to Y. A Y in this column indicates that the From Room can draw on the linked package allowances of other rooms. See Package Allowance Linking, below.

Buttons/Check Boxes

Show Profile/Loss. Select this check box to display package profit and loss information pertaining to the current room. When selected, a Package Profit or Package Loss row appears under each

Refresh. Repaint the screen with up-to-date information. Use this button to update the screen so that it reflects any changes that affect the guest's packages. For example, if you add a new package to the reservation or change to another rate code having different packages, it is necessary to refresh the screen display.

Link/Unlink. Available when the CASHIERING > PACKAGE ALLOWANCE LINKING application parameter is set to Y. Create or break package allowance links between the currently selected room and another room. See Package Allowance Linking, below.

Close. Exit the Package Options screen and return to the Options menu.

Report. Select this button to prepare a Package Options report, showing the guest Name, Room Number, Arrival and Departure Dates, Rate Code, Package Name, Description, Date Posted, Allowance, Posted Amount and Overage.

Note: Prices and allowances displayed for packages will be the price and allowance from the configuration of the package when it was attached to the reservation. Since the package price and allowance is stored at the reservation level, package prices and allowances can be different from reservation to reservation and from within the Package configuration to the reservation.

Package Options Examples

Example 1 - Guest expenditures are less than the package allowance: The package in this example offers an $85 allowance for restaurant purchases that is included in the guest's room rate. During his stay, the guest has consumed $15 of the allowance, shown in the Posted column. This $15 charge will not appear on the guest's Billing screen or on the guest's folio. It is included in the room rate.

Example 2 - Guest expenditures exceed the package allowance: This guest has a package that provides an allowance of $85 in banquet expenses. If the guest consumes $95 in banquet expenses, there results a $10 overage (the difference between the amount consumed and the amount of the allowance). The $85 in the Allowance column shows the amount allowed by the package. The $85 in the Posted column is the amount consumed by the guest which is covered by the allowance. This amount will not appear on the guest's Billing screen or on his folio. The $10 in the Overage column is the amount not covered by the allowance. The $10 charge will appear on the guest's Billing screen and folio.

Example 3 - Multiple guest expenditures: This guest has an $85 allowance for restaurant purchases per day. On the first day of his stay the guest consumes the allowance, plus a $10 overage. An $85 charge is shown as Posted and a $10 charge is shown as an Overage. The overage of $10 will show on the guest's Billing screen and folio. . On the second day, he consumes $45 in restaurant purchases, plus $16 in restaurant purchases. The screen shows  Posted amounts of $45 and $16. The green-shaded row shows the total posted allowance each day — $85 the first day and $61 the second day.

Tax Considerations

Packages can include tax (these packages are called inclusive packages) or they can be exclusive of tax (these packages are exclusive packages). If tax is not included in the package price, the guest will be billed for taxes separately, based on the price of the package (not the allowance). In addition, the guest will be billed for taxes due on any overage.

If the package includes taxes, the guest is billed for taxes only if there is an overage.

When the CASHIERING > DEFERRED TAXES application parameter is active, the package allowance related taxes are posted only when accessing the Billing screen and are removed when the Billing screen is closed. The taxes finalize and remain only after the bill number is assigned to them.

Package Allowance Linking

When the CASHIERING > PACKAGE ALLOWANCE LINKING application parameter is set to Y (this parameter is available when the RATES > ADVANCED PACKAGES application function is set to Y), you can make use of package allowance linking. Package allowance linking enables multiple rooms to mutually consume the value of the allowances attached to the participating reservations.

Note: To draw on the value of a linked package allowance, the package belonging to the consuming guest must be the same as the package to which the linked allowance belongs (or, both packages must have a matching transaction code, or a matching alternate transaction code). In other words, an allowance for a Breakfast Package belonging to a guest in one room can be applied against the consumption of a Breakfast Package belonging to a guest in another room. (Or an allowance for an American Breakfast Package belonging to a guest in one room can be applied against the consumption of a Continental Breakfast Package belonging to a guest in another room if both packages have the same transaction code.) However, the Breakfast Package allowance cannot be applied against consumption of a Golf Package allowance. This is consistent with consumption handling of package allowances for individual guests when there is no package linking.

The rooms in a linked allowance relationship are known as the "source" room and the "target" room. The source room makes its allowance available to the target room. Whether or not the source room can draw on the allowance(s) of the target room (and/or the allowances of any other source rooms linked to the target room) depends on your response to a prompt that appears when the link is created: "Use other allowances on target room?" Your answer to this prompt determines whether the link is "one-way" or "two-way":

  • If you reply Yes, the source room contributes its allowance(s) to the linked allowance "pool" and is able to draw from the allowances of the target room and/or any other source rooms linked to the target room.
  • If you reply No, the source room contributes its allowance(s) to the linked allowance "pool," but will be restricted from drawing from the allowances of the target room and/or any other source rooms linked to the target room.

Linking is established by selecting the Link button from the Package Options screen of the source room, and choosing the target room. One source room and one target room can be linked, or multiple source rooms can be linked to a single target room.

The former arrangement might involve a family staying at a property. The parents have one room with a breakfast allowance (we can call the parents' room the target), and the children are staying in a separate room (the source) with a breakfast allowance. The total value of the two allowances will be shared by the parents and the children. (See Example 1, below.)

The latter arrangement might be used for a PM room for a business block. The PM room, the target, serves to pool the allowances of the group (the sources) which will then consume the total value of their combined allowances. (See Example 2, below.)

Notice that the source room must have at least one package with an allowance in order to link to a target. The target room could contribute its own package allowance.

Following are some other points to keep in mind when working with linked package allowances:

  • When an allowance from another source is drawn upon, the choice of which qualifying linked source room the allowance is taken from is random.
  • Any overage is posted to the consuming room.
  • Taxes are posted to the bill of the guest where the allowance originates.
  • Linking is done from the source room. Unlinking can be done from either the source or the target room. However, once a charge is made against an allowance of either the source or target room,  the linking cannot be broken until following End of Day processing.
  • When a charge is posted by the target room, and that charge is covered by the allowance belonging to a source room, the following message appears: "Package allowance exists for this transaction code. Do you want to post against the allowance?" Reply Yes to continue posting against the source room's allowance. Reply No to post the charge to the target room. The posting against the allowance uses the property time zone to determine the valid time of the package.
  • An allowance effectively remains on the respective source reservations themselves, but if a source reservation should, for example, check out early, the allowance for that reservation will not get moved/allocated from the source reservation to the target reservation. This is due to the fact that OPERA has already generated the Package Profit/Loss for that source reservation and that reservations allowance will no longer be available for sharing. Click here for detailed example.

Example 1

A family is staying at the property with the parents in room 108 and the children in room 109. Each reservation has a $20 breakfast allowance. At 7 AM the children have breakfast and consume $15 from their allowance. At 10 AM the parents have breakfast and consume $35 worth of food.  $20 of this comes from their allowance and $5 comes from the remaining linked allowance from room 109. Room 108 is charged a $10 overage.

Example 2

In the above example, rooms 111, 112, 113, and 114 belong to a business block and are source rooms in a package allowance linking arrangement. Room 9000 is the PM for the group and is the target room for allowance linking. Each of the source rooms has a Breakfast Package with a $20 allowance. Room 112 also has a Golf Package with a $50 allowance.

At 2 PM the guest in room 112 plays golf and incurs a $55 greens fee. $50 of this comes from room 112's Golf Package allowance and $5 is charged as an overage. (None of the other source rooms has a Golf Package, so allowance linking does not apply.)

The next morning at 8 AM the guest in room 113 has breakfast worth $25. $20 of this comes from room 113's package allowance and $5 is drawn from the linked allowance belonging to room 114. (The choice of the room from which the linked allowance is drawn — in this case room 114 — is random.)

At 9 AM the guest in room 114 has breakfast worth $20. $15 is taken from room 114's remaining allowance and $5 is charged to room 114 as an overage.

Note: Because "Use other allowances on target room?" is set to No for room 114, room 114 would not be able to draw from other linked rooms' allowances.

Shortly thereafter the guest in room 112 has breakfast and consumes $25 worth of food. $20 of this comes from room 112's package allowance and $5 is drawn from the linked allowance belonging to room 111.

Finally, the guest in room 111 has breakfast totaling $18. $15 is drawn from the remaining Breakfast Package allowance for room 111, and $3 is charged to room 111 as an overage. (None of the other source rooms has a Breakfast Package allowance remaining, so allowance linking does not apply.)

Linking and Unlinking Package Allowances

To set up a package allowance link, open the Package Options screen for the source room, the room that will be making its allowance available to the target room. Select the Link button. The Charge Routing screen appears. Select the target room.

When you select OK, this message appears: "Use other allowances on target room?" If you select Yes, the source room can draw on the allowances of the target room as well as any other source rooms linked to the target room. (A Y is shown in the Others column on the Package Options screen.) If you reply No, the source room cannot draw on the allowances of other linked rooms. (An N is shown in the Others column on the Package Options screen.)

Following linking, the target room is identified in the lower left corner of the source room's Package Options screen. (On the target room's Package Options screen, the From Room field will show the room number of the source room.)

After the source room is linked to the target room, the Link button changes to Unlink. To unlink the source room from the target room, select the Unlink button and choose the target room from the Charge Routing screen.

Note: Once a charge is made against an allowance of either the source or target room,  the linking cannot be broken until following End of Day processing.

Example

The target room (room 521) posts a charge that is $10 in excess of its allowance ($85). $85 is posted against the room's own allowance (the second row), and $10 is drawn from the allowance of room 517 (the third row). The Y in the Other column indicates that room 517 can also draw from the allowances of other rooms.

The excess is shown posted to the Package Options screen of the source room.

Package allowance linking enables reservations to share an allowance amongst them. The allowance effectively remains on the respective reservations themselves, but the allowance will not get moved/allocated from the source reservation to the target reservation, should the source reservation, for example, check out. OPERA has already generated the Package Profit/Loss for that reservation and the allowance is no longer available for sharing.



Источник: [https://torrent-igruha.org/3551-portal.html]

Here's what's in the bipartisan infrastructure package

It will deliver $550 billion of new federal investments in America's infrastructure over five years, touching everything from bridges and roads to the nation's broadband, water and energy systems. Experts say the money is sorely needed to ensure safe travel, as well as the efficient transport of goods and produce across the country. The nation's infrastructure system earned a C- score from the American Society of Civil Engineers earlier this year.
Democrats claim the legislation pays for itself through a multitude of measures and without raising taxes. But the Congressional Budget Office brushed aside several of those pay-for provisions, ultimately finding the package would add $256 billion to the deficit over the next 10 years. It's significantly smaller than the $2.25 trillion proposal that Biden unveiled in March, known as the American Jobs Plan.
Here's what's in the infrastructure package:
Funding for roads and bridges
The legislation calls for investing $110 billion for roads, bridges and major infrastructure projects. That's significantly less than the $159 billion that Biden initially requested in the American Jobs Plan.
Included is $40 billion for bridge repair, replacement and rehabilitation, according to the text. The White House says it would be the single, largest dedicated bridge investment since the construction of the interstate highway system, which started in the 1950s.
The deal also contains $16 billion for major projects that would be too large or complex for traditional funding programs, according to the White House.
Some 20%, or 173,000 miles, of the nation's highways and major roads are in poor condition, as are 45,000 bridges, according to the White House.
The investments will focus on climate change mitigation, resilience, equity and safety for all users, including cyclists and pedestrians.
Also in the package is $11 billion for transportation safety, including a program to help states and localities reduce crashes and fatalities, especially of cyclists and pedestrians, according to the White House. It willdirect funding for safety efforts involving highways, trucks, and pipeline and hazardous materials.
And it contains $1 billion to reconnect communities -- mainly disproportionately Black neighborhoods -- that were divided by highways and other infrastructure, according to the White House. It will fund planning, design, demolition and reconstruction of street grids, parks or other infrastructure.
Money for transit and rail
The package provides $39 billion to modernize public transit, according to the text. That's less than the $85 billion that Biden initially wanted to invest in modernizing transit systems and help them expand to meet rider demand.
The funds will repair and upgrade existing infrastructure, make stations accessible to all users, bring transit service to new communities and modernize rail and bus fleets, including replacing thousands of vehicles with zero-emission models, according to the White House.
The deal willalso invest $66 billion in passenger and freight rail, according to the text. The funds would eliminate Amtrak's maintenance backlog, modernize the Northeast Corridor line and bring rail service to areas outside the Northeast and mid-Atlantic regions, according to the White House. Included in the package is $12 billion in partnership grants for intercity rail service, including high-speed rail.
The funding is less than the $80 billion Biden originally wanted to send to Amtrak, which he relied upon for decades to get home to Delaware from Washington, DC.
Still, it would be the largest federal investment in public transit in history and in passenger rail since the creation of Amtrak 50 years ago, according to the White House.
The legislation provides a $65 billion investment in improving the nation's broadband infrastructure, according to the text. Biden initially wanted to invest $100 billion in broadband.
It also aims to help lower the price households pay for internet service by requiring federal funding recipients to offer a low-cost affordable plan, by creating price transparency and by boosting competition in areas where existing providers aren't providing adequate service. It willalso create a permanent federal program to help more low-income households access the internet, according to the White House fact sheet.
Upgrading airports, ports and waterways
The deal willinvest $17 billion in port infrastructure and $25 billion in airports to address repair and maintenance backlogs, reduce congestion and emissions near ports and airports and promote electrification and other low-carbon technologies, according to the White House.
It is similar to the funding in Biden's original proposal.
The legislation will provide $7.5 billion for zero- and low-emission buses and ferries, aiming to deliver thousands of electric school buses to districts across the country, according to the White House.
Another $7.5 billion will go to building a nationwide network of plug-in electric vehicle chargers, according to the text.
Improving power and water systems
The package invests $65 billion to rebuild the electric grid, according to the White House. It calls for building thousands of miles of new power lines and expanding renewable energy, the White House said.
It provides $55 billion to upgrade water infrastructure, according to the text. It will replace lead service lines and pipes so that communities have access to clean drinking water, the White House said.
Another $50 billion will go toward making the system more resilient -- protecting it from drought, floods and cyberattacks, the White House said.
Environmental remediation
The package provides $21 billion to clean up Superfund and brownfield sites, reclaim abandoned mine land and cap orphaned gas wells, according to the White House.

How Congress will pay for it

The legislation includes a multitude of measures to pay for the proposal -- none of which would raise taxes.
But while lawmakers claim the package pays for itself, the CBO score found it would instead add billions of dollars to the deficit over 10 years and that many of the pay-for provisions would not raise as much money as Democrats said they would.
The bottom line is that the legislation would directly add roughly $350 billion to the deficit, when taking into account $90 billion of spending in new contract authority, said Marc Goldwein, senior vice president at the Committee for a Responsible Federal Budget, a nonpartisan group that tracks federal spending.
According to the text and a 57-page summary of the legislation, lawmakers leaned heavily on repurposing unused Covid-19 relief funds to pay for the legislation. The CBO found these measures would provide roughly $22 billion in savings, rather than the roughly $263 billion claimed by lawmakers, Goldwein said.
The text lists savings from rescinding unobligated appropriations for the Economic Injury Disaster Loan program for small businesses and nonprofit groups, the Paycheck Protection Program, the Education Stabilization Fund and relief for airline workers, among others.
Another item in the textis $53 billion that stems in part from states opting to terminate the pandemic unemployment benefits early in hopes of pushing the jobless to return to work. Some 24 states stopped at least one of the federal unemployment programs before they officially ended in early September. Also, the CBO reduced its forecast for the unemployment rate because of the improving economy.
The agency also found that the Federal Communications Commission's spectrum auctions would generate far less than the $87 billion originally claimed by lawmakers.
The CBO also said that the legislation will raise about $50 billion by imposing new Superfund fees and changing the tax reporting requirements for cryptocurrencies, among other measures.
More savings would come from delaying a controversial Trump administration rule that would radically change how drugs are priced and paid for in Medicare and Medicaid until 2026, at the earliest. The measure will effectively ban drug makers from providing rebates to pharmacy benefit managers and insurers. Instead, drug companies will be encouraged to pass the discounts directly to patients at the pharmacy counter. It is currently expected to go into effect in 2023. The summary lists the savings as $49 billion and the CBO report as nearly $51 billion.
Also, the infrastructure package relies on generating $56 billion in economic growth resulting from a 33% return on investment on the long-term projects, according to the summary.
Biden has said that the legislation won't raise taxes on people making less than $400,000 a year and does not include a gas tax increase or fee on electric vehicles. He initially called for raising taxes on corporations to fund the infrastructure investments -- but that proposal did not make it into the final package after strong opposition from Republicans.
The package leaves out Biden's proposal to spend $400 billion to bolster caregiving for aging and disabled Americans -- the second largest measure in the American Jobs Plan.
His proposal would have expanded access to long-term care services under Medicaid, eliminating the wait list for hundreds of thousands of people. It would have provided more opportunity for people to receive care at home through community-based services or from family members.
It would also have improved the wages of home health workers, who now make approximately $12 an hour, and would have put in place an infrastructure to give caregiving workers the opportunity to join a union.
Also left on the sideline: $100 billion for workforce development, which would have helped dislocated workers, assisted underserved groups and put students on career paths before they graduate high school.
The legislation also leaves out the $18 billion Biden proposed to modernize Veterans Affairs hospitals, which are on average 47 years older than private-sector hospitals.
What's also out is a slew of corporate tax hikes that Biden wanted to use to pay for the American Jobs Plan.
Biden's original proposal called for raising the corporate income tax rate to 28%, up from the 21% rate set by Republicans' 2017 tax cut act, as well as increasing the minimum tax on US corporations to 21% and calculating it on a country-by-country basis to deter companies from sheltering profits in international tax havens.
It also would have levied a 15% minimum tax on the income the largest corporations report to investors, known as book income, as opposed to the income reported to the Internal Revenue Service, and would have made it harder for US companies to acquire or merge with a foreign business to avoid paying US taxes by claiming to be a foreign company.
There are some corporate tax raising provisions that Democratic lawmakers are looking to include in the separate legislation aimed at expanding the nation's social safety net.

CNN's Manu Raju contributed to this report.

Источник: [https://torrent-igruha.org/3551-portal.html]

Here's what's included in the bipartisan infrastructure law

Politics

Sens. Rob Portman, R-Ohio, What’s included in this package?, and Kyrsten Sinema, D-Ariz., take questions at a July 28 news conference after a procedural vote for the bipartisan infrastructure What’s included in this package?. The two led negotiations that resulted in the bill. Alex Wong/Getty Images hide caption

toggle caption
Alex Wong/Getty Images

Sens. Rob Portman, R-Ohio, and Kyrsten Sinema, D-Ariz., What’s included in this package?, take questions at a July 28 news conference after a procedural vote for the bipartisan infrastructure framework. The two led negotiations that resulted in the bill.

Alex Wong/Getty Images

President Biden has signed the bipartisan infrastructure bill into law, 10 days after it passed the House on near-party lines and months after a Senate vote.

A political win for Biden, the Infrastructure Investment and Jobs Actfocuses on investments in roads, railways, bridgesand broadband internet. The price tag comes in at roughly $1 trillion, What’s included in this package?, MiniTool Power Data Recovery 10 Crack + Keygen Free Download $550 billion in new spending over five years, What’s included in this package?.

The bill was separated from what Biden has referred to as "human infrastructure," including money allocated for child care and tax credits for families. Democrats are looking to address those priorities separately in a "Build Back Better" social spending and climate package.

Here's a look at what's included in the infrastructure legislation (the White House also has this breakdown of spending by state):

Transportation

  • Roads, bridges, major projects: $110 billion
  • Passenger and freight rail: $66 billion
  • Public transit: $39 billion
  • Airports: $25 billion
  • Port infrastructure: $17 billion
  • Transportation safety programs: $11 billion
  • Electric vehicles: $7.5 billion
  • Zero and low-emission buses and ferries: $7.5 billion
  • Revitalization of communities: $1 billion

Other infrastructure

  • Broadband: $65 billion
  • Power infrastructure: $73 billion
  • Clean drinking water: $55 billion
  • Resilience and Western water storage: $50 billion
  • Removal of pollution from water and soil: $21 billion

How will it be paid for?

The package is financed through a combination of funds, including repurposing unspent emergency relief funds from the COVID-19 pandemic and strengthening tax enforcement for cryptocurrencies. While negotiators said that the cost of the plan would be offset entirely, the Congressional Budget Office predicted it would add about $256 billion to projected deficits over 10 years.

Goals What’s included in this package? the plan

Back in Z3x Crack Samsung Tool Pro 2019 [Latest version] Free download, the White House shared a fact sheet with the aims of the package:

  • Improve healthy, sustainable transportation options for millions of Americans by modernizing and expanding transit and rail networks across the country while reducing greenhouse gas emissions.
  • Repair and rebuild roads and bridges with a focus on climate change mitigation, resilience, equity and safety for all users, including cyclists and pedestrians.
  • Build a national network of electric vehicle chargers along highways and in rural and disadvantaged communities.
  • Electrify thousands of school and transit buses across the country to reduce harmful emissions and drive domestic manufacturing of zero emission vehicles and components.  
  • Eliminate the nation's lead service lines and pipes, delivering clean drinking water to up to 10 million American families and more than 400,000 schools and child care facilities that currently don't have it, including in tribal nations and disadvantaged communities.
  • Connect every American to reliable high-speed internet.
  • Upgrade the power infrastructure, including by building thousands of miles of new, resilient transmission lines to facilitate the expansion of renewable energy, including through a new grid authority.  
  • Make the largest investment in addressing legacy pollution in American history.
  • Prepare more infrastructure for the impact of climate change, cyberattacks and extreme weather events.
Источник: [https://torrent-igruha.org/3551-portal.html]

Tidyverse packages

Installation and use

  • Install all the packages in the tidyverse by running .

  • Run to load the core tidyverse and make it available in your current R session.

Learn more about the tidyverse package at https://tidyverse.tidyverse.org.

Core tidyverse

The core tidyverse includes the packages that you’re likely to use in everyday data analyses. As of tidyverse 1.3.0, the following packages are included in the core tidyverse:

ggplot2

ggplot2 is a system for declaratively creating graphics, based on The Grammar of Graphics. You provide the data, tell ggplot2 how to map variables to aesthetics, what graphical primitives to use, and it takes care of the details. Go to docs.

dplyr

dplyr provides a grammar of data manipulation, providing a consistent set of verbs that solve the most common What’s included in this package? manipulation challenges. Go to docs.

tidyr

tidyr provides a set of functions that help you get to tidy data. Tidy data is data with a consistent form: in brief, every variable goes in a column, and every column is a variable. Go to docs.

readr

readr provides a fast and friendly way to read rectangular data (like csv, tsv, and fwf). It is designed to flexibly parse many types of data found in the wild, while still cleanly failing when data unexpectedly changes.  Go to docs.

purrr

purrr enhances R’s functional programming (FP) toolkit by providing a complete and consistent set of tools for working with functions and vectors. Once you master the basic concepts, purrr allows you to replace many for loops with code that is easier to write and more expressive. Go to docs.

tibble

tibble is a modern re-imagining of the data frame, keeping what SpyHunter 5 License Key Archives has proven to be effective, and throwing out what it has not. Tibbles are data.frames that are lazy and surly: they do less and complain more forcing What’s included in this package? to confront problems earlier, typically leading to cleaner, more expressive code. Go to docs.

stringr

stringr provides a cohesive set of functions designed to make working with strings as easy as possible. It is built on top of stringi, which uses the ICU C library to provide fast, correct implementations of common string manipulations. Go to docs.

forcats

forcats provides a suite of useful tools that solve common problems with factors. R uses factors to handle categorical variables, variables that have a fixed and known set of possible values. Go to docs.

The tidyverse also includes many other packages with more specialised usage, What’s included in this package?. They are not loaded automatically withso you’ll need to load each one with its own call to .

Import

As well as readr, for reading flat files, the tidyverse package installs a number of other packages for reading data:

Wrangle

In addition to tidyr, and dplyr, there are five packages (including stringr and forcats) which are designed to work with specific types of data:

  • lubridate for dates and date-times.
  • hms for time-of-day values.
  • blob for storing blob (binary) data.

dplyr backends

There are also two packages that allow you to interface with different backends using the same dplyr syntax:

  • dbplyr allows you to use remote database tables by converting converting dplyr code into SQL.
  • dtplyr provides a data.table backend by automatically translating to the equivalent, but usually much faster, data.table code.

Program

In addition to What’s included in this package? purrr, which provides very consistent and natural methods for iterating on R objects, there are two additional tidyverse packages that help with general programming challenges:

  • magrittr provides the pipe, used throughout the tidyverse. It also provide a number of more specialised piping operators (like and ) that can be useful in other places.

  • glue provides an alternative to that makes it easier to combine data and strings.

Model

Modeling with the tidyverse uses the collection of tidymodels packages, which largely replace the modelr package used in R4DS. These packages provide a comprehensive foundation for creating and using models of all types. Visit the Getting Started guide or, for more detailed examples, go straight to the Learn page.

Get help

If you’re asking for R help, reporting a bug, or requesting a new feature, you’re more likely to succeed if you include a What’s included in this package? reproducible example, which is precisely what the reprex package is meant for. You can learn more about reprex, along with other tips on how to help others help you in the help section.

Источник: [https://torrent-igruha.org/3551-portal.html]

Here's what's in the bipartisan infrastructure package

It will deliver $550 billion of new What’s included in this package? investments in America's infrastructure over five years, touching everything from bridges and roads to the nation's broadband, water and energy systems. Experts say the money is sorely needed to ensure safe travel, as well as the efficient transport of goods and produce across the country. The nation's infrastructure system earned a C- score from the American Society of Civil Engineers earlier this year.
Democrats claim the legislation pays for itself through a multitude of measures and without raising taxes. But the Congressional Budget Office brushed aside several of those pay-for provisions, ultimately finding the package would add $256 billion to the deficit over the next 10 years. It's significantly smaller than the $2.25 trillion proposal that Biden unveiled in March, known as the American Jobs Plan.
Here's what's in the infrastructure package:
Funding for roads and bridges
The legislation calls for investing $110 billion for roads, bridges and major infrastructure projects. That's significantly less than the $159 billion that Biden initially requested in the American Jobs Plan.
Included is $40 billion for bridge repair, replacement and rehabilitation, according to the text. The White House says it would be the single, largest dedicated bridge investment since the construction of the interstate highway system, which started in the 1950s.
The deal also contains $16 billion for major projects that would be too large or complex for traditional funding programs, according to the White House.
Some 20%, or 173,000 miles, of the nation's highways and major roads are in poor condition, as are 45,000 bridges, according to the White House.
The investments will focus on climate change mitigation, resilience, equity and safety for all users, including cyclists and pedestrians.
Also in the package is $11 billion for transportation safety, including a program to help states and localities reduce crashes and fatalities, especially of cyclists and pedestrians, according to the White House. It willdirect funding for safety efforts involving highways, trucks, and pipeline and hazardous materials.
And it contains $1 billion to reconnect communities -- mainly disproportionately Black neighborhoods -- that were divided by highways and other infrastructure, according to the White House. It will fund planning, design, demolition and reconstruction of street grids, parks or other infrastructure.
Money for transit and rail
The package provides $39 billion to modernize public transit, according to the text. That's less than the $85 billion that Biden initially wanted to invest in modernizing transit systems and help them expand to meet rider demand.
The funds will repair and upgrade existing infrastructure, make stations accessible to all users, bring transit service to new communities and modernize rail and bus fleets, including replacing thousands of vehicles with zero-emission models, according to the White House.
The deal willalso invest $66 billion in passenger and freight rail, according to the text. The funds would eliminate Amtrak's maintenance backlog, modernize the Northeast Corridor line and bring rail service to areas outside the Northeast and mid-Atlantic regions, according to the White House. Included in the package is $12 billion in partnership grants for intercity rail service, including high-speed rail.
The funding is less than the $80 billion Biden originally wanted to send to Amtrak, which he relied upon for decades to get home to Delaware from Washington, DC.
Still, it would be the largest federal investment in public transit in history and in passenger rail since the creation of Amtrak 50 years ago, What’s included in this package?, according to the White House.
The legislation provides a $65 billion investment in improving the nation's broadband infrastructure, according to the text. Biden initially wanted to invest $100 billion in broadband.
It also aims to help lower the price households pay for internet service by requiring federal funding recipients to offer a low-cost affordable plan, What’s included in this package?, by creating price transparency and by boosting competition in areas where existing providers aren't providing adequate service. It willalso create a permanent federal program to help more low-income households access the internet, according to the White House fact sheet.
Upgrading airports, ports and waterways
The deal willinvest $17 billion in port infrastructure and $25 billion in airports to address repair and maintenance backlogs, reduce congestion and emissions near ports and airports and promote electrification and other low-carbon technologies, according to the White House.
It is similar to the funding in Biden's original proposal.
The legislation will provide $7.5 billion for zero- and low-emission buses and ferries, What’s included in this package?, aiming to deliver thousands of electric school buses to districts across the country, according to the White House.
Another $7.5 billion will go to building a nationwide network of plug-in electric vehicle chargers, according to the text.
Improving power and water systems
The package invests $65 billion to rebuild the electric grid, according to the White House. It calls for building thousands of miles of new power lines and expanding renewable energy, the White House said.
It provides $55 billion to upgrade water infrastructure, according to the text. It will replace lead service lines and pipes so that communities have access to clean drinking water, the White House said.
Another $50 billion will go toward making the system more resilient -- protecting it from drought, floods and cyberattacks, the White House said, What’s included in this package?.
Environmental remediation
The package provides $21 billion to clean up Superfund and brownfield sites, reclaim abandoned mine land and cap orphaned gas wells, according to the White House.

How Congress will pay for it

The legislation includes a multitude of measures What’s included in this package? pay for the proposal -- none of which would raise taxes.
But while lawmakers claim the package pays for itself, the CBO score found it would instead add billions of dollars to the deficit over 10 years Freemake Video Converter Crack 4.1.13.83 + Serial Key that many of the pay-for provisions would not raise as much money as Democrats said they would.
The bottom line is that the legislation would directly add roughly $350 billion to the deficit, when taking into account $90 billion of spending in new contract authority, said Marc Goldwein, senior vice president at the Committee for a Responsible Federal Budget, a nonpartisan group that tracks federal spending.
According to the text and a 57-page summary of the legislation, lawmakers leaned heavily on repurposing unused Covid-19 relief funds to pay for the legislation. The CBO found these measures would provide roughly $22 billion in savings, rather than the roughly $263 billion claimed by lawmakers, Goldwein said.
The text lists savings from rescinding unobligated appropriations for the Economic Injury Disaster Loan program for small businesses and nonprofit groups, the Paycheck Protection Program, the Education Stabilization Fund and relief for airline workers, among others.
Another item in the textis $53 billion that stems in part from states opting to terminate the pandemic unemployment benefits early in hopes of pushing the jobless to return to work. Some 24 states stopped at least one of the federal unemployment programs before they officially ended in early September. Also, the CBO reduced its forecast for the unemployment rate because of the improving economy.
The agency also found that the Federal Communications Commission's spectrum auctions would generate far less than the $87 billion originally claimed by lawmakers.
The CBO also said that the legislation will raise about $50 billion by imposing new Superfund fees and changing the tax reporting requirements for cryptocurrencies, among other measures.
More savings would come from delaying a controversial Trump administration rule that would radically change how drugs are priced and paid for in Medicare and Medicaid until 2026, at the earliest. The measure will effectively ban drug makers from providing rebates to pharmacy benefit managers and insurers. Instead, drug companies will be encouraged to pass the discounts directly to patients at the pharmacy counter. It is currently expected to go into effect in 2023. The summary lists the savings as $49 billion and the CBO report as nearly $51 billion.
Also, the infrastructure package relies on generating $56 billion in economic growth resulting from a 33% return on investment on the long-term projects, according to the summary.
Biden has said that the legislation won't raise taxes on people making less than $400,000 a year and does not include a gas tax increase or fee on electric vehicles. He initially called for raising taxes on corporations to fund the infrastructure investments -- but that proposal did not make it into the final package after strong opposition from Republicans.
The package leaves out Biden's proposal to spend $400 billion to bolster caregiving for aging and What’s included in this package? Americans -- the second largest measure in the American Jobs Plan.
His proposal would have expanded access to long-term care services under Medicaid, eliminating the wait list for hundreds of thousands of people. It would have provided more opportunity for people to receive care at home through community-based services or from family members.
It would also have improved the wages of home health workers, who now make approximately $12 an hour, and would have put in place an infrastructure to give caregiving workers the opportunity to join a union.
Also left on the sideline: $100 billion for workforce development, which would have helped dislocated workers, assisted underserved groups and put students on career paths before they graduate high school.
The legislation also leaves out the $18 billion What’s included in this package? proposed to modernize Veterans Affairs hospitals, which are on average 47 years older than private-sector hospitals.
What's also out is a slew of corporate tax hikes that Biden wanted to use to pay for the American Jobs Plan.
Biden's original proposal called for raising the corporate income tax rate to 28%, up from the 21% rate set by Republicans' 2017 tax cut act, as well as increasing the minimum tax on US corporations to 21% and calculating it on a country-by-country basis to deter companies from sheltering profits in international tax havens.
It also would have levied a 15% minimum tax on the income the largest corporations report to investors, known as book income, as opposed to the income reported to the Internal Revenue Service, and would have made it harder for US companies to acquire or merge with a foreign business to avoid paying US taxes by claiming to be a foreign company.
There are some corporate tax raising provisions that Democratic lawmakers What’s included in this package? looking to include in the separate legislation aimed at expanding the nation's social safety net.

CNN's Manu Raju contributed to this report.

Источник: [https://torrent-igruha.org/3551-portal.html]

Package manager

Software tools for handling software packages

Synaptic, example of a full-featured package manager

A package manager or package-management system is a collection of software tools that automates the process of installing, upgrading, configuring, and removing computer programs for a computer in a consistent manner.[1]

Early package managers, like from 1994, had no automatic dependency resolution[2] but could already drastically simplify the process of adding and removing software from a running system.[3] By around 1995, beginning with CPAN, package managers began doing the work of downloading packages from a repository, automatically resolving its dependencies and installing them as needed, making it much easier to install, uninstall and update software from a system.[4]

A package manager deals with packages, distributions of software and data in archive files. Packages contain metadata, such as the software's name, description of its purpose, version number, vendor, checksum (preferably a cryptographic hash function), and a list of dependencies necessary for the software to run properly. Upon installation, metadata is stored in a local package database. Package managers typically maintain a database of software dependencies and version information to prevent software mismatches and missing prerequisites, What’s included in this package?. They work closely with software repositories, binary repository managers, and app stores.

Package managers are designed to eliminate the need for manual installs and updates. This can be particularly useful for large enterprises whose operating systems are typically consisting of hundreds or even tens of thousands of distinct software packages.[5]

Functions[edit]

Illustration of a package manager being used to downloadnew software, What’s included in this package?. Manual actions can include accepting a license agreement or selecting some package-specific configuration options.

A software package is an archive file containing a computer program as well as necessary metadata for its deployment. The computer program can be in source code that has to be compiled and built first.[6] Package metadata include package description, package version, and dependencies (other packages that need to be installed beforehand).

Package managers are charged with the task of finding, installing, maintaining or uninstalling software packages upon the user's command. Typical functions of a package management system include:

  • Working with file archivers to extract package archives
  • Ensuring the integrity and authenticity of the package by verifying their checksums and digital certificates, respectively
  • Looking up, downloading, installing, What’s included in this package?, or updating existing software from a software repository or app store
  • Grouping packages by function to reduce user confusion
  • Managing dependencies to ensure a package is installed with all packages it requires, thus avoiding "dependency hell"

Challenges with shared libraries[edit]

Computer systems that rely on dynamic library linking, instead of static library linking, share executable libraries of machine instructions across packages and applications. What’s included in this package? these systems, complex relationships between different packages requiring different versions of libraries results in a challenge colloquially known as "dependency hell". On Microsoft Windows systems, this is also called "DLL hell" when working with dynamically linked libraries. Good package management is vital on these systems.[7] The Framework system from OPENSTEP was an attempt at solving this issue, by allowing multiple versions of libraries to be installed simultaneously, What’s included in this package?, and for software packages to specify which version they were linked against, What’s included in this package?.

Front-ends for locally compiled packages[edit]

System administrators may install and maintain software using tools other than package management software. For example, a local administrator may download unpackaged source code, What’s included in this package?, compile it, and install it. This may cause the state of the local system to fall out of synchronization with the state of the package manager's database. The local administrator will be required to take IBM SPSS Statistics 27.0.2 (64-bit) For Windows Free Full Latest Download measures, such as manually managing some dependencies or integrating the changes into the package manager.

There are tools available to ensure that locally compiled packages are integrated with the package management. For distributions based on .deb and .rpm files as well as Slackware Linux, there is CheckInstall, and for recipe-based systems such as Gentoo Linux and hybrid systems such as Arch Linux, it is possible to write a recipe first, which then ensures that the package fits into the local package database.[citation needed]

Maintenance of configuration[edit]

Particularly troublesome with software upgrades are upgrades of configuration files. Since package managers, at least on Unix systems, originated as extensions of file archiving utilities, they can usually only either overwrite or retain configuration files, rather than applying rules to them. There are exceptions to this that usually apply to kernel configuration (which, if broken, will render the computer unusable after a restart). Problems can be caused if the format of configuration files changes; for instance, What’s included in this package?, if the old configuration file does not explicitly disable new options that should be disabled. Some package managers, such as Debian's dpkg, allow configuration during installation. In other situations, it is desirable to install packages with the default configuration and then overwrite this configuration, for instance, in headless installations to a large number of computers. This kind of pre-configured installation is also supported by dpkg.

Repositories[edit]

To give users more control over the kinds of software that What’s included in this package? are allowing to be installed on their system (and sometimes due to legal or convenience reasons on the distributors' side), software is often downloaded from a number of software repositories.[8]

Upgrade suppression[edit]

When a user interacts with the package management software to bring about an upgrade, it is customary to present the user with the list of actions to be executed (usually the list of packages to be upgraded, and possibly giving the old and new version numbers), and allow the user to either accept the upgrade in bulk, or select individual packages for upgrades. Many package managers can be configured to never upgrade What’s included in this package? packages, or to upgrade them only when critical vulnerabilities or instabilities are found in the previous version, as defined by the packager of the software. This process is sometimes called version pinning.

For instance:

  • yum supports this with the syntax exclude=openoffice*[9]
  • pacman with IgnorePkg= openoffice[10] (to suppress upgrading openoffice in both cases)
  • dpkg and dselect support this partially through the hold flag in package selections
  • APT extends the hold flag through the complex "pinning" mechanism[11] (Users can also blacklist a package[12])
  • aptitude has "hold" and "forbid" flags
  • portage supports this through the package.mask configuration file

Cascading package removal[edit]

Some of the more advanced package management features offer "cascading package removal",[10] in which all packages that depend on the target package and all packages that only the target package depends on, are also removed.

Comparison of commands[edit]

Although the commands are specific for every particular package manager, they are to a large extent translatable, as most package managers offer similar functions.

Actionzypper[13]pacmanaptdnf (yum)portageNixHomebrew
install packagenix-env -i PACKAGE
remove package or
nix-env -e PACKAGE
remove package+orphans or
nix-env -e PACKAGE && nix-env -u
update software databasenix-channel --upgrade
show updatable packages or
nix-channel --upgrade && nix-env -u && nix-collect-garbage
delete orphans+confignix-collect-garbage -d
show orphans or
update allnix-env -u && nix-collect-garbage

The Arch Linux Pacman/Rosetta wiki offers an extensive overview.[14]

Prevalence[edit]

Package managers like dpkg have existed as early as 1994.[15]

Linux distributions oriented to binary packages rely heavily on package management systems as their primary means of managing and maintaining software. Mobile operating systems such as Android (Linux-based), iOS (Unix-based), and Windows Phone rely almost exclusively on their respective vendors' app stores and thus use their own dedicated package management systems.

Comparison with installers[edit]

A package manager is often called an "install manager", which can lead to a confusion between package managers and installers. The differences include:

Criterion Package manager Installer
Shipped with Usually, the operating system Each computer program
Location of installation information One central installation database It is entirely at the discretion of the installer. It could be a file within the app's folder, or among the operating system's files and folders. At best, they may register themselves with an uninstallers list without exposing installation information.
Scope of maintenance Potentially all packages on the system Only the product with which it was bundled
Developed by One package manager vendor Multiple installer vendors
Package format A handful of well-known formatsThere could be as many formats as the number of apps
Package format compatibility Can be consumed as long as the package manager supports it. What’s included in this package? newer versions of the package manager keep supporting it or the user does not upgrade the package manager. The installer is always compatible with its archive format, if What’s included in this package? uses any. However, installers, like all computer programs, may be affected by software rot.

Comparison with build automation utility[edit]

Most software configuration management systems treat building software and deploying software as separate, independent steps, What’s included in this package?. A build automation utility typically takes human-readable source code files already on a computer, and automates the process of converting them into a binary executable package on the same or remote computer. Later a package manager typically running on some other computer downloads those pre-built binary executable packages over the internet and installs them.

However, What’s included in this package?, both kinds of tools have many commonalities:

  • For example, the dependency graphtopological sorting used in a package manager to handle dependencies between binary components is also used in a build manager to handle the dependency between source components.
  • For example, many makefiles support not only building executables, but also installing them with .
  • For example, every package manager for a source-based distribution – Portage, Sorcery, Homebrew, What’s included in this package?, etc. – supports converting human-readable source code to binary executables and installing it.

A few tools, such as Maak and A-A-P, are designed to handle both building and deployment, and can be used as either a build automation utility or as a package manager or both.[16]

Common package managers and formats[edit]

Universal package Superantispyware Professional key 2021 v8.0.1046 With Full Crack known as binary repository manager, it is a software tool designed to optimize the download and storage of binary files, artifacts and packages used and produced in the software development process.[17] These package managers aim to standardize the way enterprises treat What’s included in this package? package types. They give users the ability to apply security and compliance metrics across all artifact types. Universal package managers have been referred to as being at the center of a DevOps toolchain.[18]

Package formats[edit]

Main articles: Package format and File archive

Each package manager relies on the format and metadata of the packages it can manage. That is, package managers need groups of files to be bundled for the specific package manager along with appropriate metadata, such as dependencies. Often, a core set of utilities manages the basic installation from these packages and multiple package managers use these utilities to provide additional functionality.

For example, yum relies on rpm as a backend. Yum extends the functionality of the backend by adding features such as simple configuration for maintaining a network of systems. As another example, the Synaptic Package Manager provides a graphical user interface by using the Advanced Packaging Tool (apt) library, What’s included in this package?, which, in turn, relies on dpkg for core functionality.

Alien is a program that converts between different Linux package formats, supporting What’s included in this package? between Linux Standard Base (LSB) compliant .rpm packages. deb, Stampede (.slp), Solaris (.pkg) and Slackware (.tgz. txz. tbz. tlz) packages.

In mobile operating systems, Google Play consumes Android application package (APK) package format while Microsoft Store uses APPX and XAP formats. (Both Google Play and Microsoft Store have eponymous package managers.)

Free and open source software systems[edit]

By the nature of free and open source software, packages under similar and compatible licenses are available for use on a number of operating systems. These packages can be combined and distributed using configurable and internally complex Xilisoft ISO Maker 1.0.21.0112 crack serial keygen systems to handle many permutations of software and manage version-specific dependencies and conflicts, What’s included in this package?. Some packaging systems of free and open source software are also themselves released as free and open source software, What’s included in this package?. One typical difference between package management in proprietary operating systems, such as Mac OS X and Windows, and those in free and open source software, such as Linux, is that free and open source software systems permit third-party packages to also be installed and upgraded through the same mechanism, whereas the package managers of Mac OS X and Windows will only upgrade software provided by Apple and Microsoft, respectively (with the exception of some third party drivers in Windows). The ability to continuously upgrade third party software is typically added by adding the URL of the corresponding repository to the package management's configuration file.

Application-level package managers[edit]

See also: List of software package management systems § Application-level package managers

Beside the system-level application managers, there are some add-on package managers for operating systems with limited capabilities and for programming languages in which developers need the latest libraries.

In contrast to system-level package managers, application-level package managers focus on a small part of the software system. They typically reside within a directory tree that is not maintained by the system-level package manager, such as c:\cygwin or /opt/sw.[19] However, this might not be the case for the package managers that deal with programming libraries, leading to a possible conflict as both package managers may claim to "own" a file and might break upgrades.

Impact[edit]

Ian Murdock had What’s included in this package? that package management is IObit Smart Defrag Pro 6.6.5.19 + Key (Latest Version) 2021 Free Download What’s included in this package? biggest advancement Linux has brought to the industry", that it blurs the boundaries between operating system and applications, and that it makes it "easier to push new innovations [.] into the marketplace and [.] evolve the OS".[20]

There is also a conference for package manager developers known as PackagingCon. It was established in 2021 with the aim to understand different approaches to package management.[21]

See also[edit]

References[edit]

External links[edit]

Источник: [https://torrent-igruha.org/3551-portal.html]

Package Options

Packages are used to provide guests with amenities and services in a way that is attractive, convenient, and highly marketable. Packages can be attached to a rate code and included in the room rate, they can be sold separately and attached to the reservation, or they can be available under both arrangements. A "Bed and Breakfast" package is an example of a package that incorporates a room plus breakfast service for a single set rate amount. A "Golf Holiday" package might include a half-day golf cart rental and greens fees at a reduced rate. The package could be made available to guests as part of their room rate or separate from their accommodations. (See Packages for full details on how packages are set up and managed.)

Packages can have an allowance associated with them, What’s included in this package?. The allowance is the amount of goods or services represented by the package that the guest is permitted to consume. Any consumption above the allowance is called an overage for which the guest is billed. Entries on the Package Options screen let you trace the consumption of each package which provides an allowance to the guest.

If the package does not include an allowance, no entry appears on this screen. For example, a What’s included in this package? package — champagne, What’s included in this package?, chocolates, and flowers — might post an $80 charge to the foxit pdf editor crack Archives - Patch Cracks bill during Night Audit. Consumption is fixed, so no allowance is involved and no entry What’s included in this package? for this package on the Package Options screen. Or, the package might simply add a flat charge to the guest's room rate; for example, What’s included in this package?, a $20 charge for the "Deluxe Robe" package might be reflected in the guest's $350 room charge. (The package cost may be broken out separately on the guest's folio, depending on how the package is configured.) Again, no entry for this package would appear on the Package Options screen.

The Package Options screen is accessible from both the Reservations module and from the Cashiering module. From the Reservation screen or from the Billing screen, select the Package Options button from the Options menu to access the Package Options screen.

Package elements are identified by their transaction code and description. Entries are sequenced by their date and transaction code. Separate entries tell you the allowance provided by the package; the amount of the allowance consumed by the guest; and, if the guest has consumed an amount in excess of the allowance, the amount of overage. The overage is charged to the guest's bill.

Note: When you manually post charges to a transaction code that is included in a package assigned to the guest, What’s included in this package?, a message asks you whether you want to apply the charge to the package allowance. If you select Yes, the charge is posted against the package allowance. If you select No, What’s included in this package?, the charge is posted to the guest's bill and is not subtracted from the allowance.

When posting a negative amount and Yes is selected on the message, then this amount will be added to and will increase the package allowance amount.

A green shaded row summarizes the postings against each package for each day of the stay. Related taxes applicable to the package are marked by in a separate green-shaded summary row. Individual posting records for the package on that day follow the green shaded row.

Rate Code. Rate code to which the package is attached.

Package. Package code.

Code. The transaction code attached to the package element.

Description. The description of the transaction code.

Date. The date the transaction was posted against the package.

Allowance. The amount allowed by the package, What’s included in this package?, in local base currency. OPERA adds the allowance entry automatically at check-in or during Night Audit. When multiple packages that have the same Product and Transaction Code are attached to What’s included in this package? reservation, the allowance amounts will be combined into one line item.

For Example

Package 11ABK (with 1234 Trx. Code) has been attached to the ARACK Rate Code in configuration and has an allowance of $16.28. So when a reservation is checked in with the ARACK Rate Codethe package options screen will show one line for this package for that specific date with allowance of 16.28. If the same package is added to the reservation manually, it will create another allowance for 16.28.

The Package Options screen will display one line item to summarize this, i.e. a total allowance of 32.56. Each of the postings made to trx. code 1234 that consume allowance will be shown separately, i.e. 2 postings of 14.95, in this case. See image below.

multiple_allowances_on_one_reservation_package_options

Note: When a reservation share exists that uses the same rate code with a package and have assigned the total 232Analyzer 4.1 crack serial keygen rate charge for all sharers to a specific sharer with the Entire option, the Allowance will not be posted to the reservation until the Share that has been assigned the charges is Checked In.

For Example
Create a reservation with rate code PKGRATE, this rate code has a BFST package with per person allowance of $20.00.

Create a share reservation for 1 adult with this rate code. Within the Sharer screen, place cursor on first/primary share and select the Entire option.

Select the second sharer (i.e., the reservation with 0.00 rate) and check it in.

Front Desk > In House > Search and select the second share > options > Package Options. There will be no allowance created.

Select the first/primary share; Check it in > Reservation Options > Package Options > this share shows $40.00 allowance which is the allowance for both shares.

When negative postings are made against a package allowance, manually in OPERA or from a POS system, OPERA will first post an offset transaction to adjust the overage generated for that package. If there is any amount remaining, after adjusting the overage amount, then it will be applied against the original allowance which could result in an increased allowance on that package. Essentially making a negative posting against allowance transaction code will offset any overage first before increasing the package allowance.

Only an overage for the same business date that was posted as a negative posting will be adjusted for same day and next day packages. Once the business date is rolled, the overage for the previous business date will not be offset. However for the case of floating allowance packages, an overage posted on any date during stay will be offset, as the allowance is for the entire stay and not for any specific date of stay.

When an overage transaction is posted to a billing window, the reference will now include the package code that generated the overage transaction. Similarly, the offset transaction will What’s included in this package? a reference as Overage Reversal including the package code that generated the overage transaction.

For Example
Reservation Details
Rate Code = RACK/Package Code = BFST
Package Price = $10.00 and Allowance = $10.00 on trx. code 2003
1. $20.00 posted against the allowance. Message prompt "Do you want to post against the allowance?" is displayed in OPERA. No message in POS and action is automatically taken, What’s included in this package?. $10.00 is then displayed on the guest folio as an Overage.
2. Negative $20.00 is posted against trx. code. 2003. OPERA will check for an overage made to transaction code 2003. In this case, the Overage posted to the guest's folio will be posted against.
The remaining $10.00 is then posted as an offset/negative consumption against the original $10.00 that was consumed for the package.
This leaves the original allowance amount of $10.00 available for the package.

If multiple package allowances exist on the reservation that have the same transaction code, OPERA will look at the first package that has the specified transaction code with the negative posting to offset the allowance.

Note: Only the 1st package will have the entire offset amount applied to it. OPERA will NOT apply any equivalent offset amounts to all the packages.

For Example

If 2 packages have allowances for $20.00 and $40.00 on transaction code 2000.

Posting $20.00 on transaction code 2000 will consume the 1st allowance from the 1st package.

Posting $45.00 on transaction code 2000 will consume the 2nd allowance from the 2nd package, and will also create an overage of $5.00.

Now if a negative posting is made on transaction code 2000 for $50.00. 1st the $5.00 offset is posted for the overage and then the remaining $45.00 is applied to the 2nd package that created the overage. So the Package options screen would like below where 2nd package has a -$5.00 as the posted amount thus increasing the allowance to a total of $45.00.

negative_posting_against_allowance_4

Posted. The amount applied toward guest consumption of the package. The amount posted is subtracted from the allowance. The posted amount is considered to be included in the package and is not shown on the guest's bill.

Note: Once a posting has been made against a package allowance, the amount posted will not reflect any subsequent change in the exchange rate.

Overage. The amount, if any, of charges above the package allowance, What’s included in this package?. This amount is added to the guest's bill.

From Room. Available when the CASHIERING > PACKAGE ALLOWANCE LINKING application parameter is set to Y. The room where the posting originated. Blank if the posting originated in the current room. See Package Allowance Linking, below.

Used Room. Available when the CASHIERING > PACKAGE ALLOWANCE LINKING application parameter is set to Y. The room whose allowance was used. Blank if the current room's allowance was used. See Package Allowance Linking, below.

Others. Available when the CASHIERING > PACKAGE ALLOWANCE LINKING application parameter is set to Y. A Y in this column indicates that the From Room can draw on the linked package allowances of other rooms. See Package Allowance Linking, below.

Buttons/Check Boxes

Show Profile/Loss. Select this check box to display package profit and loss information pertaining to the current room. When selected, a Package Profit or Package Loss row appears under each

Refresh. Repaint the screen with up-to-date information. Use this button to update the screen so that it reflects any changes What’s included in this package? affect the guest's packages. For example, What’s included in this package? you add a new package to the reservation or change to another rate code having different packages, it is necessary to refresh the screen display.

Link/Unlink. Available when the CASHIERING > PACKAGE ALLOWANCE LINKING application parameter is set to Y. Create or break package allowance links between the currently selected room and another room. See Package Allowance Linking, below.

Close, What’s included in this package?. Exit the Package Options screen and return to the Options menu.

Report, What’s included in this package?. Select this button to prepare a Package Options report, showing the guest Name, Room Number, Arrival and Departure Dates, Rate Code, Package Name, Description, Date Posted, Allowance, Posted Amount and Overage.

Note: Prices and allowances displayed for packages will be the price and allowance from the configuration of the package when it was attached to the reservation. Since the package price and allowance is stored at the reservation level, package prices and allowances can be different from reservation to reservation and from within the Package configuration to the reservation.

Package Options Examples

Example 1 - Guest expenditures are less than the package allowance: The package in this example offers an $85 allowance for restaurant purchases that is included in the guest's room rate. During his stay, the guest has consumed $15 of the allowance, shown in the Posted column. This $15 charge will not appear on the guest's Billing screen or on the guest's folio. It is included in the room rate.

Example 2 - Guest What’s included in this package? exceed the package allowance: This guest has a package that provides an allowance of $85 in banquet expenses. If the guest consumes $95 in banquet expenses, there results a $10 overage (the difference between the amount consumed and the amount of the allowance). The $85 in the Allowance column shows the amount allowed by the package. The $85 in the Posted column is the amount consumed by the guest which is covered by the allowance. This amount will not What’s included in this package? on the guest's Billing screen or on his folio. The $10 in the Overage column is the amount not covered by the allowance. The $10 charge will appear on the guest's Billing screen and folio.

Example 3 - Multiple guest expenditures: This guest has an $85 allowance for restaurant purchases per day. On the first day of his stay the guest consumes the allowance, What’s included in this package?, plus a $10 overage. An $85 charge is shown as Posted and a $10 charge is shown as an Overage. The overage of $10 will show on the guest's Billing screen and folio. On the second day, he consumes $45 in restaurant purchases, plus $16 in restaurant purchases. The screen shows  Posted amounts of $45 and $16. The green-shaded row shows the total posted allowance each day — $85 the first day and $61 the second day.

Tax Considerations

Packages can include tax (these packages are called inclusive packages) or they can be exclusive of tax (these packages are exclusive packages). If tax is not included in the package price, the guest will be billed for taxes separately, based on the price of the package (not the allowance). In addition, the guest will be billed for taxes due on any overage.

If the package includes taxes, the guest is billed for taxes only if there is an overage.

When the CASHIERING > DEFERRED TAXES application parameter is active, the package allowance related taxes are posted only when accessing the Billing screen and are Pixologic ZBrush 2021.6.4 Crack + Torrent Full Free Download Latest when the Billing screen is closed. The taxes finalize and remain only after the bill number is assigned to them.

Package Allowance Linking

When the CASHIERING > PACKAGE ALLOWANCE LINKING application parameter is What’s included in this package? to Y (this parameter is available when the RATES > ADVANCED PACKAGES application function is set to Y), you can make use of package allowance linking. Package allowance linking enables multiple rooms to mutually consume the value of the allowances attached to the participating reservations.

Note: To draw on the value of a linked package allowance, the package belonging to the consuming guest must be the same as the package to which the linked allowance belongs (or, both packages must have a matching transaction code, What’s included in this package?, or a matching alternate transaction code), What’s included in this package?. In other words, an allowance for a Breakfast Package belonging to a guest in one room can be applied against the consumption of a Breakfast Package belonging to a guest in another room. (Or an allowance for an American Breakfast Package belonging to a guest in one room can be applied against the consumption of a Continental Breakfast Package belonging to a guest in another room if both packages have the same transaction code.) However, the Breakfast Package allowance cannot be applied against consumption of What’s included in this package? Golf Package allowance. This is consistent with consumption handling of package allowances for individual guests when there is no package linking.

The rooms in a linked allowance relationship are known as the "source" room and the "target" room. The source room makes its allowance available to the target room. Whether or not the source room can draw on the allowance(s) of the target room (and/or the allowances of any other source rooms linked to the target room) depends on your response to a prompt that appears when the link is created: "Use other allowances on target room?" Your answer to this prompt determines whether the link is "one-way" or "two-way":

  • If you reply Yes, the source room contributes its allowance(s) to the linked allowance "pool" and is able to draw from the allowances of the target room and/or any other source rooms linked to the target room.
  • If you reply No, the source room contributes its What’s included in this package? to the linked allowance "pool," but will be restricted from drawing from the allowances of the target room and/or any other source rooms linked to the target room.

Linking is established by selecting the Link button from the Package Options screen of the source room, What’s included in this package?, and choosing the target room. One source room and one target room can be linked, or multiple source What’s included in this package? can be linked to a single target room.

The former arrangement might involve a family staying at a property. The parents have one room with a breakfast allowance (we can call the parents' room the target), and the children are staying in a separate room (the source) with a breakfast allowance, What’s included in this package?. The total value of the two allowances will be shared by the parents and the children. (See Example 1, below.)

The latter arrangement might be used for a PM room for a business block. The PM room, the target, serves to pool the allowances of the group (the sources) which will then consume the total value of their combined allowances. (See Example 2, below.)

Notice that the source room must have at least one package with an allowance in order to link to a target. The target room McAfee SafeKey crack serial keygen contribute its own package allowance.

Following are some other points to keep in mind when working with linked package allowances:

  • When an allowance from another source is drawn upon, the choice of which qualifying linked source room the allowance is taken from is random.
  • Any overage is posted to the consuming room.
  • Taxes are posted to the bill of the guest where the allowance originates.
  • Linking is done from the source room. Unlinking can be done from either the source or the target room. However, once a charge is made against an allowance of either the source or target room,  the linking cannot be broken until following End of Day processing.
  • When a charge is posted by the target room, and that charge is covered by the allowance belonging to a source room, the following message appears: "Package allowance exists for this transaction code. Do you want to post against the allowance?" Reply Yes to continue posting against the source room's allowance. Reply No to post the charge to the target room, What’s included in this package?. The posting What’s included in this package? the allowance uses the property time zone to determine the valid time of the package.
  • An allowance effectively remains on the respective source reservations themselves, but if a source reservation should, for example, check out early, the allowance for that reservation will not get moved/allocated from the source reservation to the target reservation, What’s included in this package?. This is due to the What’s included in this package? that OPERA has already generated the Package Profit/Loss for that source reservation and that reservations allowance will no longer be available for sharing. Click here for detailed example.

Example 1

A family is staying at the property with the parents in room 108 and the children in room 109. Each reservation has a $20 breakfast allowance. At 7 AM the children have breakfast and consume $15 from their allowance. At 10 AM the parents have breakfast and consume $35 worth of food.  $20 of this comes from their allowance and $5 comes from the remaining linked allowance from room 109. Room What’s included in this package? is charged a $10 overage.

Example 2

In the above example, What’s included in this package?, rooms 111, 112, What’s included in this package?, 113, and 114 belong to a business block and are source rooms in a package allowance linking arrangement. Room 9000 is the PM for the group and is the target room for allowance linking. Each of the source rooms has a Breakfast Package with a $20 allowance. Room 112 also has a Golf Package with a $50 allowance.

At 2 PM the guest in room 112 plays golf and incurs a $55 greens fee. $50 of this comes from room 112's Golf Package allowance and $5 is charged as an overage. (None of the other source rooms has a Golf Package, What’s included in this package?, so allowance linking does not apply.)

The next morning at 8 AM the guest in room 113 has breakfast worth $25. $20 of this comes from room 113's package allowance and $5 is drawn from the linked allowance belonging to room 114, What’s included in this package?. (The choice of the room from which the linked allowance is drawn — in this case room 114 — is random.)

At 9 AM the guest in room 114 has breakfast worth $20. $15 is taken from room 114's remaining allowance and $5 is charged to room 114 as an overage.

Note: Because "Use other allowances on target room?" is set to No for room 114, room 114 would not be able to draw from other linked rooms' allowances.

Shortly thereafter the guest in room 112 has breakfast and consumes $25 worth of food. $20 of this comes from room 112's package allowance and $5 is drawn from the linked allowance belonging to room 111.

Finally, the guest in room 111 has breakfast totaling $18. $15 is drawn from the remaining Breakfast Package allowance for room 111, What’s included in this package?, and $3 is charged to room 111 as an overage. (None of the other source rooms has a Breakfast Package allowance remaining, so allowance linking does not apply.)

Linking and Unlinking Package Allowances

To set up a package allowance link, open What’s included in this package? Package Options screen for the source room, the room that will be making its allowance available to the target room. Select the Link button. The Charge Routing screen appears. Select the target room.

When NetCaptor Pro v6.5.0 beta 2 crack serial keygen select OK, this message appears: "Use other allowances on target room?" If you select Yes, the source room can draw on the allowances of the target room as well as any other source rooms linked to the target room. (A Y is shown in the Others column on the Package Options screen.) If you reply No, What’s included in this package?, the source room cannot draw on the allowances of other linked rooms. (An N is shown in the Others column on the Package Options screen.)

Following linking, the target room is identified in the lower left corner of the source room's Package Options screen. (On the target room's Package Options screen, the From Room field will show the room number of the source room.)

After the source room is linked to the target room, the Link button changes to Unlink. To unlink the source room from the target room, select the Unlink button and choose the target room from the Charge Routing screen.

Note: Once a charge is made against an allowance of either the source or target room,  the linking cannot be broken until following End of Day processing.

Example

The target room (room 521) posts a charge that is $10 in excess of its allowance ($85). $85 is posted against the room's own allowance (the second row), and $10 is drawn from the allowance of room 517 (the third row). The Y in the Other column indicates that room 517 can also draw from the allowances of other rooms.

The excess is shown posted to the Package Options screen of the source room.

Package allowance linking enables reservations to share an allowance amongst them. The allowance effectively remains on the respective reservations themselves, but the allowance will not get moved/allocated from the source reservation to the target reservation, should the source reservation, for example, check out. OPERA has already generated the Package Profit/Loss for that reservation and the allowance is no longer available for sharing.



Источник: [https://torrent-igruha.org/3551-portal.html]
What’s included in this package?

1 comments

Leave a Reply

Your email address will not be published. Required fields are marked *